DMTA069-01EN, Rev. D, March 2017
ChainSCANNER Setup and Connection
27
— When the catch link is used, the buckle-catch link assembly can be placed at
any convenient location along the circumference of the pipe.
— When the catch link is not used (on a pipe with a curvature smaller radius, for
example), hook the buckle directly to the rear attachment of the main module.
4.
Using the link knobs, assemble the selected links together (see Figure 2-6 on
page 27).
Figure 2-6 Pull out and rotate slightly to latch the link knobs to the open position.
5.
Attach this link assembly to the front and rear attachments of the main module.
2.3
Probe Holders Adjustment and Maintenance
The ChainSCANNER can hold a pair of conventional UT probes or a pair of phased
array probes. The probes are mounted on probe holders (see Figure 2-7 on page 28)
that need the following types of adjustments:
•
Latching or unlatching the probe holder (see page 28).
•
Installing the wedge-probe assembly onto the probe holder (see page 29).
•
Installing the probe holder onto the ChainSCANNER (see page 29).
•
Installing or removing the y-axis slide assembly (see page 34).
•
Using the y-axis adjustment (see page 32).
•
Adjusting the distance between the probes (see page 31).
Содержание ChainSCANNER
Страница 5: ...DMTA069 01EN Rev D March 2017 Table of Contents v Index 87 ...
Страница 6: ...DMTA069 01EN Rev D March 2017 Table of Contents vi ...
Страница 8: ...DMTA069 01EN Rev D March 2017 List of Abbreviations viii ...
Страница 18: ...DMTA069 01EN Rev D March 2017 Important Information Please Read Before Use 10 ...
Страница 20: ...DMTA069 01EN Rev D March 2017 Introduction 12 ...
Страница 28: ...DMTA069 01EN Rev D March 2017 Chapter 1 20 ...
Страница 64: ...DMTA069 01EN Rev D March 2017 Chapter 5 56 ...
Страница 74: ...DMTA069 01EN Rev D March 2017 Chapter 6 66 ...
Страница 78: ...DMTA069 01EN Rev D March 2017 Chapter 7 70 ...
Страница 84: ...DMTA069 01EN Rev D March 2017 Appendix A 76 ...
Страница 94: ...DMTA069 01EN Rev D March 2017 List of Tables 86 ...