SELF-TESTING MAINTAINED ILLUMINATION SIGNS WITH WHITE LEDs
ZLD-34
TECHNICAL CHARACTERISTICS
Operation temperature range
Relative humidity
Construction materials
External dimensions
Typical weight
Guarantee
Mains voltage
Maximum power consumption
Batteries (Ni-MH)
Recharging time
Battery protection
Indications
Minimum emergency duration
Degrees of cover protection
Produced in accordance with
Light source intensity (230V) / (emerg.)
220-240V AC/50-60Hz
3h
24h
Overcharging and full discharging protection
Charge LED, Lamp Fault LED, Fault LED
IP 40
3.6V/1.5Ah
145lm / 125lm
8.5 VA
EN 60598-1, EN 60598-2-22, EN 1838
o
0 to 40 C
up to 95%
Aluminum
,
plexiglas
3 years
(1
year for the battery
)
1020gr.
350x225x38mm
922503452_09_011
Page
1 from
4
Operation instructions
automatically every 15 days. In order to be
Installation
To install the illumination sign you must
performed, the main power supply and the
connect the battery first (see page 4) and
battery should be connected.
follow the installation instructions in pages 2
and 3.
Automatic Autonomous Test
The Automatic autonomous Test is
Battery Cut-off
conducted and measures the luminaire`s
The luminaire enters in this operation when
back up operation. This test is conducted
the mains power supply fails
and battery
automatically every six months
.
In order to
has lost its energy
.
During this operation the
be performed, the main power supply and
luminaire enters the idle state
and battery
the battery should be connected (the battery
consumption is negligible, in order to be
should be charged)
.
If the battery is not
protected from deep discharge.
charged
,
the test is postponed
until the
battery is completely charged.
Battery charging
The battery charging is completely
Back Up Operation
controled
.
In this case, is
achieved the
The autonomous duration of battery during
perfect battery maintenance
,
as well as
emergency mode is at least the one that is
the elongation of its duration
.
When the
stated in the list of the first page. During
battery has completely charged
,
it charges
emergency mode, a LED strip test is also
with a maintenance current.
performed.
Manual
Test
Resetting Errors
The manual test can be conducted only if
Push the Test button for 5 seconds, to
the main power supply and the battery is
extinguish all the indicated LED errors.
connected.By pressing the test button
Then the luminaire enters regular
operation
briefly an operation test is initiated. During
mode.
this test period all indication LEDs are OFF.
Automatic test
This test includes all the operations that
provide the manual test and
is conducted
Battery installation and replacement process
1 Unfasten the 4 screws without moving the marking panel
.
2
Unfasten the 4
screws and remove the marking panel.
3
Slide out carefully the electronic parts and the battery.
4 Install the battery’s connector to the appropriate P.C.B connector.
5 Slide in carefully the electronic parts and the battery.
6
Refit the marking panel and fasten the removed screws in steps 1 and 2
.
WARNING
!!
Use a maximum torque of
0,25Í
m
to tighten the screws
.
ÍÏÔÅ!!
In case of battery replacement remove the used battery and place a new one with the same type
.
General
:
1. Operations for installation, maintainance or testing must be done by authorized personel only
.
2.
The device must be connected to the mains power supply thru a fuse dependent by the total
amount of the line’s power load
.
t i
in battery recycling points. Do not incinerate.
NOTE:
LED= Light Emitting Diode
LABELING EXPLANATION:
X: Self contained 1: Maintained A: Including test device 180: 3 hour duration
3.
In case of inactive use for a period greater than 2 months, disconnect the battery by pulling out
the battery’s connector.
4.
I s not allowed to discard batteries in to common trash bins, they must be discarded
only
1
2
922503452_09_011
Page 4 from
4
3
4