These devices are used indoors
(
ta 40 C
)
in
places where emergency light is needed. Each
device must be permanently connected to
mains power supply
.
In normal operation the
battery is charging. In case of a mains power
supply failure, the device enters emergency
mode and the illumination LED turns on. When
the mains power supply is restored the device
turns to normal operation.
Battery Charging
The battery charging is completely controlled
by microprocessor and is protected from
complete discharge and overcharge
.
Battery Cut-off
The luminaire enters in this mode when the
mains power supply fails
and battery has lost its
energy
.
During this mode the luminaire enters
the idle state
and battery consumption is
negligible, in order to be protected from deep
discharge.
Automatic Operational Test
T
his test is conducted automatically every 15
days and lasts 3 seconds. In order to be
performed, the mains power supply and the
battery should be connected. The light source
and the emergency circuit of the device are
tested.
Automatic Autonomy Test
T
he Automatic Autonomy Test tests the device’s
back up operation and emergency duration.
This test is conducted automatically every 6
months and its duration is the stated autonomy
duration of the luminaire
.
In order to be
performed, the mains power supply should be
connected and the battery must be fully
charged
.
If the battery is not fully charged
,
the
test is postponed
until the battery is completely
charged. If during this test, the autonomy is less
than nominal then the battery fault LED will
permanently be on and the battery must be
replaced.
B
ack Up Operation
T
he autonomy duration of battery during
emergency mode must be at least as the one
stated in the list of the technical characteristics.
During emergency mode, a light source test is
also performed.
ΑΤΤΕΝΤΙΟΝ!
!!
1. Operations for installation, maintainance or
testing must be done by authorized
personnel only
.
2. The device must be connected to the mains
power supply through a fuse that is
dependent on the total line’s power load.
3. In case of battery replacement, it must be
replaced by the same type, by the
manufacturer or a competent person.
4. In case of inactive use for a period greater
than 2 months, disconnect the battery by
pulling out the battery’s connector.
5.
The control gear within this luminaire is a
built in control gear which relies on the
luminaire for protection against electric
shock.
6. The control gear is proof against supply
voltage polarity reversal.
7. This control gear has mains connected
primary windings.
8.
I
s not allowed to discard batteries into
t i
common trash bins, they must be
discarded only
in battery recycling
points. Do not incinerate.
Connectors
KL1:
Power connector
KL2:
Non user terminal
CN4:
Battery connector
CN5:
LED connector
CN6:
Non user connector
CN7:
Non user terminal
General
Mounting Methods
Sky Line luminaries can be surface mounted on walls or ceilings. For these mounted installations,
special accessories are included.
Wall
bottom
view
Wall installation
Ceiling installation
Ceiling
* ATTENTION!!! The below mounting methods and markings can be done after request of the
necessary accessories!!
Extra Mounting and Marking Methods *
Suspended ceiling installation
with
mounting accessory
A-1000
Suspended installation with A-1000 accessory
The luminary can be installed in a suspended
ceiling.
A marking panel (
SP-1000
) can be installed on the luminary pointing the desired direction.
Suspended ceiling installation
with
mounting accessories
and marking panel
Ceiling installation
with marking panel
It can be done only by a competent person and after the mains interruption
.
1. Follow step 1 of the installation instructions and remove the diffusor.
2. Follow step 2 of the installation instructions and remove the reflector.
3. Remove the old battery and place a new one of the same type and characteristics.
4. Replace the removed parts (previous steps 1 and 2).
Battery Replacement
Package Contents
Commissioning
—
After installation, a 24 hours charging cycle must be completed, in order to achieve the nominal autonomy.
—
During commissioning of the luminaire write the commissioning date on the battery.
—
When power is applied to the unit inspect that the CHARGE indicator is either blinking or steady, all other
indicators are OFF and that the led lamp is lit (maintained operation) or OFF (non-maintained operation)
—
A full duration test should be conducted after verifying that the CHARGE indicator is continuously ON. Test is
initiated by isolating the mains power supply. Verify that the LED lamp is lit during the test period for at least
the stated duration.
923
100300
_0
9
_010
2
Installation Instructions
Always use in any case round mains cable
,
with a diameter
of 5
-
10mm (H05RN-F type
2x1mm²
or
any
other type
,
at least
equal
to
it’s mechanical and electrical properties).
ATTENTION!! The cable must not be deformed
in any way (This requirement is important to
ensure the
ΙΡ
rating).
3
5
7
9
4
6
8
10
B
N L L1
A
Attention!!
The plastic latches (A) must be
secured (click sound). This requirement is
important to ensure the IP65 rating. P
ower on
the luminar
y
.
Install the included tie (if needed) to fasten
securely the power cables.
Ν
for neutral,
L
for live wire and
L1
for the
maintained operation.
A
A
A
A
A
A
B
N L L1
A
2
1
N
L
Link
Permanent maintained operation
b)
N
L
External
switch
Controlled operation of the lamp
a)
Power Connections
Battery Connection
This unit has replaceable batteries that can be replaced or changed by the manufacturer or a competent person.
Description
Indications
LED Status
BATT.
FAULT
(
yellow
)
LAMP
FAULT
(
red
)
CHARGE
(
green
)
Fully charged
Charging
Battery fault or
emergency mode
Operational test
Light source fault
Autonomy test
Duration fault
Note
: