INSTALLATION PROCEDURE (For wall mounting only)
TEST
button
Fig
.
1
POWER
CHARGE
indicator
Mounting holes
LAMP FAULT
BATT. FAULT
indicator
Cover
retaining
screws
1. Use the supplied mounting accessories to mount the device
(
Fig
1
)
.
2.
Remove the four cover retaining screws
(
Fig
1
)
.
3. Install the battery cable connectors to the batteries taking care of the polarity, black cable (-)
and red cable
(+)
.
4.
Always use in any case round mains cable
,
with external diameter
of
6-9
mm (H05RN-F
type 2x1mm²
or
any
other type
,
at least
equal
to it’s mechanical and electrical properties).
ATTENTION!! The cable must not be deformed in any way (This requirement is important
to ensure the tightness isolation IP65).
Install
the cable gland and pass the round cable.
Connect the cables to the respective positions in the terminal block
L
for phase and N for
neutral
(Fig 2)
.
C,
L, A are also connected, while signals -L, B in the terminal NO (Fig.4).
6
.
Reinstall the front cover and fasten the retaining screws. (Tightening torque
1
Nm
).
Pay attention to the 4 sealing o-rings.
WARNING!!
After the installation has finished, charge the batteries for at least 24 hours so as to obtain
the rated autonomy duration
.
5.
If you use a module, open a hole from the other side of the luminaire (Fig.3). Install
the cable
gromme
t and pass the 2 signal cables on the C,NO terminal
(Fig. 4), minding the correct
polarity. Depending on the module that will be used, the cables, have different names. In
Fig
.2
N
L
4
3
Fig
.
3
5
Module
position
Fig
.4
5