Page 2 from 2
ΑΤΤΕΝΤΙΟΝ!!!
1. Operations for installation, maintainance or
testing must be done by authorized personel only.
2. The device must be connected to the mains
power supply thru a fuse dependent by the total
amount of the line’s power load.
In case of battery or lamp replacement, these
must be replaced by parts of the same type, by the
manufacturer or by a competent person.
t i
in battery recycling points. Do not
incinerate.
3.
4. In case of inactive use for a period greater than 2
months, disconnect the battery by pulling out the
battery’s connector.
5.
I
s not allowed to discard batteries in to
common trash bins, they must be discarded
only
NOTE:
LED= Light Emitting Diode
LABELING EXPLANATION:
X: Self contained 1: Maintained
A: Including test device
480: 8 hour duration
NOTE!! After finishing the installation you must
power the luminaire at least for 24 hours for
battery charging to perform the named autonomy.
Battery replacement
1. Unfasten the 4 retaining screws (step 10 of the
installation instructions) and remove the diffusor.
2. Unfasten the 2 retaining screws step 9 of the
installation instructions and remove the reflector.
3. Remove the old battery and place a new on of the
same type and characteristics.
4. Replace the removed parts (previous steps 1,2).
9
6
7
Manual TEST or Resetting Errors
In order to test or reset the device you
must carefully remove the diffusor by
unfastening the 4 mounting screws.
Then push the button as described in
the according paragraphs on page 1.
1
8
10
L1 L N
N
L
N
L
L1
L
N
L1
L
N
External
switch
Controlled operation of the lamp
Link
Permanent maintained operation
1
Remove the diffusor. Place simultaneously 2 flat blade screwdrivers and pull up gently the
reflector.
2
Install the included plastic cover in to the unused hole and install the base plastic (with the
included mounting screws and plugs).
3
Always use in any case round mains cable, with external diameter of 6-9mm (H05RN-F
type 2x1mm² or any other type, at least equal to it’s mechanical and electrical properties).
ATTENTION!! The cable must not be deformed in any way (This requirement is important
to ensure the tightness isolation IP 65).
Install
the cable gland, pass the round cable thru and
tighten it all the way.
4
Place the battery’s connector to the corresponding connector on the P.C.B.
5
Connect the mains cables to the respective terminal block (connect the ground wire if required).
6
Ν
for neutral,
L
for live wire and
L1
for the maintained operation. The
L1
wire can be connected
to an external switch to control the maintained or non maintained operation of the luminaire.
7
For permanent maintained operation use two wires to power the luminaire,
Ν
for neutral and
L
for
live wire, and link the
L
and
L1
.
8
Install the included tie (if needed) to fasten securely the power cables.
9
Refit the reflector and fasten the two small screws (included).
10
Finaly place the diffusor by using the 4 included screws (tightening torque 1.2 Nm).
INSTALLATION INSTRUCTIONS
2
3
4
5
923940000_09_008