olympia electronics GR-938/15L Скачать руководство пользователя страница 2

Page 2 from

 2

Blink

  (

With 

Charge  LED

  ON):  Autonomy  or  low 

battery problem

(the battery must be replaced).

Blink

 

(

With 

Charge LED

 Off):

 

No charging current or disconnected battery

.

ΑΤΤΕΝΤΙΟΝ

!!!

1.  Operations  for  installation,  maintainance  or 
testing must be done by authorized personel only

.

2. 

The  device  must  be  connected  to  the  mains 

power  supply  thru  a  fuse  dependent  by  the  total 
amount of the line’s  power load

.

In case of battery or lamp replacement, these

must  be  replaced  by  parts  of  the  same  type,  by 
the manufacturer or by a competent person.

3. 

4. In case of inactive use for a period greater than 
2 months, disconnect the battery by pulling out 

the battery’s connector.

 

5. 

I

s  not  allowed  to  discard  batteries  in  to 

common  trash  bins,  they  must  be  discarded 
only 

t  i

 

in  battery  recycling  points.  Do  not 

incinerate.
NOTE: 

LED= Light Emitting Diode

LABELING EXPLANATION:
X: Self contained    
1: Maintained
A: Including test device  
*90: 1.5 hour duration 
180: 3 hour duration
NOTE!! After finishing the installation you must 
power the luminaire at least for 24 hours for 
battery charging to perform the named 
autonomy. 

9

6

7

Manual TEST or Resetting Errors

In order to test or reset the device you 
must carefully remove the diffusor by 
unfastening the 4 mounting screws. 
Then push the button as described in 
the according paragraphs on page 1.  

1

8

10

L1 L N

N
L

N
L

L1

L

N

L1

L

N

External 

switch

Controlled operation of the lamp

Link

Permanent maintained operation 

1

  Remove the diffusor. Place simultaneously 2 flat blade screwdrivers and pull up gently the 

    reflector.  

2

  

Install the included plastic cover in to the unused hole and install the base plastic (with the 

    included mounting screws and plugs). 

3

  

Always use in any case round mains cable

,

 with external diameter

 

of 

6-9

mm (H05RN-F 

    type 2x1mm² 

or 

any 

other type

,

 

at least 

equal 

to it’s mechanical and electrical properties).   

    ATTENTION!! The cable must not be deformed in any way (This requirement is important 
    to ensure the tightness isolation IP 65). 

Install

 

the cable gland

,

 pass the round cable thru

 

and 

    tighten it all the way.

4

  Place the battery’s connector to the corresponding connector on the P.C.B

.  

 

Connect the mains cables to the respective terminal block 

(

connect the ground wire if required)

.  

6

  

Ν

 

for neutral

L

 for live wire

 

and 

L1

 for the maintained operation

The 

L

1

 

wire can be connected

    

to an external switch to control the maintained or non maintained operation of the luminaire

7

  

For permanent maintained operation use two wires to power the luminaire, 

Ν

 

for neutral and 

L

 for 

    

live wire, and link the 

L

 and

 

L1

.

8

  

Install the

 

included tie (if needed) to fasten securely the power cables.

9

  

Refit the reflector and fasten the two small screws (included).

10  

Finaly place the diffusor by using the 4 included screws (tightening torque 1.2 Nm)

.  

  

INSTALLATION INSTRUCTIONS

2

3

4

5

923939100_09_006

Отзывы: