Page 3 from 4
INSTALLATION INSTRUCTIONS
For wall or ceiling installation
Step 1.
Remove the diffuser. Place a flat blade screwdriver and pull up gently the reflector.
Step 2.
Install the included plastic cover in to the unused hole and install the base plastic (with the
included mounting screws and plugs).
Step 3. Always use in any case round mains cable, with external diameter of 6-9mm (H05RN-F
type 2x1mm² or any other type, at least equal to it’s mechanical and electrical properties).
ATTENTION!! The cable must not be deformed in any way (This requirement is important
to ensure the tightness isolation IP 65).
Install
the cable gland, pass the round cable through
and tighten it all the way.
Step 4.
Place the capacitor’s connector to the corresponding connector on the P.C.B.
Step 5.
Connect the mains cables to the respective terminal block (connect the ground wire if
required).
Ν
for neutral,
L
for live wire and
L1
for the maintained operation. The
L1
wire can be
connected to an external switch to control the maintained or non maintained operation of the
luminaire. For permanent maintained operation use two wires to power the luminaire,
Ν
for neutral
and
L
for live wire, and link the
L
and
L1
.
Step 6.
Install the included tie (if needed) to fasten securely the power cables.
Step 7.
Refit the reflector and fasten the two small screws (included).
Step 8.
Finally place the diffuser by using the 4 screws (tightening torque 1.2Nm).
Step 9. Manual TEST or Resetting Errors
In order to test or reset the device you must carefully remove the diffuser by unfastening the 4
mounting screws. Then push the button as described in the according paragraphs on page 1 and
2.
NOTE!!
After finishing the installation you must power the luminaire at least for 3 hours for
capacitor charging to perform the nominal autonomy.
923900000_09_007
L1 L N
1
4
7
2
3
5
8
6
9