GR-
490
/WP, GR-
492
/WP
GR-
49
1/WP, GR-
49
3/WP
1
3
923493000
_0
9
_003
Page
3 from
7
B
A
2
L
PE
N
INSTALLATION INSTRUCTIONS
cable
entry
hole
Corridor
lighting
ATTENTION!!!
During installation follow this light
direction.
Open
area
lighting
1. Detach the front cover by applying pressure using a flat blade screw driver. Next, unfasten the four
retaining screws without removing them and remove the diffusor.
2. Install the battery connector to its corresponding connector on the main pcb.
3.
Install the cable grommet in the open hole of the plastic base and open a hole in the center of the
grommet using a small screw driver. Pass the power cable through the hole in the grommet (If required,
open another cutout cable entry hole and install the second supplied cable grommet).Connect the cables
as shown in the photograph. Use the supplied self adhesive pad and cable tie to anchor the cable. If you
use a module pass the 2 signal cables on the A, B terminals minding the correct polarity. Depending on the
module that will be used, the cables that will be used, have different names. In A, L, C are also
connected, while signals -L, NC/NO in the terminal B.
4 Reinstall the diffusor and re-tighten the 4 screws in a diagonally manner with a torque of
N*m
.
0,9
.
NOTE!! After finishing the installation you must power the luminaire for at least 24 hours in order
to completely charge the battery. The rated autonomy duration can be achieved after that time.
Initial installation