background image

Page

 2

 from

 

3

923297000_09_002

Initial installation

1

   

Untighten the screw but do not remove it and pull up the reflector.

2   Place the battery’s connector to the corresponding connector on the P.C.B. 
3

   

Use any round supply cable with an external diameter of 

4,5-8

m (H05RN-F type 2x1mm² 

or 

    any 

other type

,

 

at least 

equal 

to it’s mechanical and electrical properties).

 

 WARNING

!! 

The 

cable must not be deformed in order to preserve the IP rating

.

 

Use a cable grommet type

 

PG9 

(Not supplied in the package

and pass the cable. Tighten the cable gland to form the seal. Connect 

the wires 

 as shown in the picture.

  

4

  

Refit the reflector (mind the correct orientation), tighten the screw securely and the luminaire 

    is ready for mounting

.

      

NOTE!!  After finishing the installation you must power the luminaire at least for 24 hours for 
battery charging to perform the named autonomy.

 

To mount the device in a suspended ceiling follow the steps of the 

‘’Mounting the lamp‘’

 section.  

 

For surface mounting

 (

on wall or on ceiling

follow the steps of the 

‘’Surface mounting‘’ 

section.

Ν 

for neutral

L for live wire

 and 

L1 for the maintained operation

The L

wire can be 

connected to an external switch to control the maintained or non maintained operation of the 
luminaire 

(A)

For permanent maintained operation 

(B)

 use two wires to power the luminaire, 

Ν 

for 

neutral and L for live wire, and link the L and

 

L1

INSTALLATION INSTRUCTIONS

1

1

3

2

L1

L1

230V AC

230V AC

230V AC

N

N

L

L

Link

3

(A)

(B)

Battery replacement

It can be done only by a competent person and after the mains interruption

.

1. 

Remove the luminaire from the suspended ceiling (figure 3).

2. 

Follow the step 

1

 of the installation 

instructions

.

3

. Disconnect the connector and remove the old battery.

4

. Connect the new battery with the same type (step 

2

 of the installation 

instructions

) and place it in 

the position of the old one.

5

Replace the removed parts (step 1 and 4 

)

 and power the device. 

of the installation 

instructions

Figure 1

98

6

5

125

Test 
button

Battery 
charge
indication 
LED

Отзывы: