What to do before my Shed arrives?
Become familiar with this assembly manual and determine if you can
•
complete the project yourself or will require a professional contractor.
Clear the construction area and ensure a clear pathway for delivery when
•
the freight company arrives. Remove all debris: roots, grass, rocks, etc.
Excavate the site. Contact your local utilities company to ensure there are
•
no gas or electric lines buried in the area before digging.
Decide on the type of foundation you will be using:
•
Concrete slab, or
46 inches of crushed gravel with paver stones or 4x4 stringers.
You can find the footprint for your shed on Page 3 of your Assembly Manual.
If doing the assembly yourself, have all the necessary tools ready to go and in
•
working condition. A list of required tools can be found after the parts list.
One helper is recommended to assist in constructing your shed.
•
It generally takes two people about 3 days to assemble a shed. If you’re
hiring a contractor, their rate should be in line with that duration of work.
Toll Free 1-888-658-1658 www.outdoorlivingtoday.com [email protected]
Page 2
Содержание Muskoka Cabin 9x9
Страница 31: ...1 888 658 1658 www outdoorlivingtoday com sales outdoorlivingtoday com Page 31 Plan of attic in axis 1 2 A D...
Страница 32: ...1 888 658 1658 www outdoorlivingtoday com sales outdoorlivingtoday com Page 32 Wall on axis A B...
Страница 33: ...1 888 658 1658 www outdoorlivingtoday com sales outdoorlivingtoday com Page 33 Wall on axis C D...
Страница 34: ...1 888 658 1658 www outdoorlivingtoday com sales outdoorlivingtoday com Page 34 Wall on axis 1...
Страница 35: ...1 888 658 1658 www outdoorlivingtoday com sales outdoorlivingtoday com Page 35 Pediment on axis A D Details...
Страница 36: ...1 888 658 1658 www outdoorlivingtoday com sales outdoorlivingtoday com Page 36 Roof Trim Rhomb Railing...