
57.
Attach
Rear Filler
Trims - 4 pcs- 7/8” x 2
1/2” x 75”- (Part 4D)
with
6 - 1 1/2” Finishing
Nails (Part F).
Strips are positioned
flush with siding and
bottom Skirting.
Side Bottom Skirting
55.
Attach
Front Bottom Skirting - 3/4” x 4
1/2” x 64” (Part 4B)
between door trims with
6 - 1 1/2” Finishing Nails (Part F).
56.
Attach
Side and Rear Bottom Skirting
- 1/2” x 4 1/2” x 34 3/4” (Part 4C)
with
4 - 1 1/2”
Finishing Nails (Part F)
per piece.
54.
Locate both
3/4” x 4 3/8” x 79” Door Trims (Part 4A).
Position a Trim so it covers the Door
Jambs and is flush with the inside of it. Secure with
8 - 1 1/2” Finishing Nails (Part F)
per piece.
Flush with inside
of Door Jamb
Door Jamb
Gap
Note:
All Trim, Facia and Bottom Skirting pieces will be positioned rough face out when installed.
Toll Free 1-888-658-1658 www.outdoorlivingtoday.com [email protected]
Page 26