Toll Free 1-888-658-1658 www.outdoorlivingtoday.com [email protected]
Page 9
15.
With Door Header aligned flush with Front Narrow Wall framing and Side Wall framing, attach from
the top with 6 - 2 1/2” screws (3 per side). Attach
Upper Door Stop (EE)
-Dado cut aligned to the front.
Center on Door Header and attach with 2 - 2 1/2” screws. Screw down from the header into Stop.
16.
When all walls are
attached together, check
alignment with the floor.
When positioned
correctly, fasten bottom
wall framing to floor
using 4 - 2 1/2” screws
per wall panel. (2 only
for Front Narrow Wall
Panels). Check Door
Opening making sure it
is 41” wide.
17.
Locate
Front Horizontal Trim (H)
and place above Front Narrow Wall Panel siding. Trim should sit
flush with Side Wall Siding. When aligned correctly, attach with 8 - 1 1/4” finishing nails (4 per side).
41”
Caulking
Optional
- Caulking
seams will help prevent
moisture from entering at
seam.
Caulking not included in
kit.
Floor
Upper Door Door Stop with
Dado Cut to front. (2x3)
2 - 2 1/2”
screws.