1. 

 Lay out 

Large Floor Joist Frame and 2 Floor Joists

 as 

illustrated above. Position Joists equally in Floor Joist Frame. 
Use 

Small Floor Joist Frame

 as a template to determine 

joist position. Position Joist so flush with framing.

Parts (Steps 1 - 6)

 

 Floor Joists 

(1 1/2” x 3 1/2” x 71 7/8”) 

x 6

 

Floor Joist Frames - Large

 

(45 1/2” x 75”) 

x 3 

Floor Joist Frames - Small

 

(45 1/2” x 21”) 

x 3

Hardware (Steps 1 - 6) 

S1

 

- 2 1/2” Screws

  

x 58 total

A. Floor Section

Plywood Floor 
Large (3)

Floor Joist 
Frames 
Large (3)

Floor Runners (8)

Plywood Floor 
Small (3)

Concrete Pad 
(optional foundation method)

Floor Joist 
Frames 
Small (3)

Exploded view of all parts necessary to complete 
Floor Section.  Identify all parts prior to starting. 
Note:  Floor Footprint is 136 1/2” wide x 96” deep.

Flush 
with 
framing

  Toll Free 1-888-658-1658              www.outdoorlivingtoday.com        [email protected]

Page 7

Floor Runners (2)

Содержание CB128-SLIDER-PLY-AK

Страница 1: ...Safety Points and Other Considerations Our products are built for use based on proper installation on level ground and normal residential use Please follow the instruction manual when building your sh...

Страница 2: ...on the type of foundation you will be using Concrete slab or 4 6 inches of crushed gravel with paver stones or 4x4 stringers You can nd the footprint for your shed on Page 3 of your Assembly Manual I...

Страница 3: ...of floor frame Saves money on materials easy to level and work with Gravel with Patio Paver Stones Excavate at least 6 deep and 6 wider than floor frame on each side 2 1 Cubic Yards of gravel require...

Страница 4: ...p Plates angle cut edge 4 Gable Half Walls Triangular Shaped 3 Rafter and Roof Section Rafter Assembly 2 3 4 x 4 1 2 x 84 Roof Ridge Boards 2 3 4 x 4 1 2 x 52 1 2 Roof Ridge Boards 18 1 1 2 x 3 1 2 x...

Страница 5: ...ter Bracket x 4 Facia Trim 4 3 4 x 2 1 2 x 51 Facia Nailing Strips 4 3 4 x 5 1 2 x 58 Side Facia Angle Cut 2 right 2 left 4 3 4 x 5 1 2 x 71 3 4 Front and Rear Facia 2 Pentagon Facia Plate For Side Fa...

Страница 6: ...ls Brush off dirt from walls Brush off snow from roof regularly Routinely remove needles and leaves from roof Painting Staining Your cedar shed if left untreated will weather to a silvery grey colour...

Страница 7: ...r Joist Frames Large 45 1 2 x 75 x 3 Floor Joist Frames Small 45 1 2 x 21 x 3 Hardware Steps 1 6 S1 2 1 2 Screws x 58 total A Floor Section Plywood Floor Large 3 Floor Joist Frames Large 3 Floor Runne...

Страница 8: ...l be 136 1 2 wide x 96 deep 5 Complete all large and small frame attachments Screw each completed section together with 8 2 1 2 Screws Front of Shed You can find the Square Drive Bit for the screws in...

Страница 9: ...your foundation Caution you will need 2 people to assist you Be careful when laying floor down not to bend or twist floor When in place level floor completely Note The floor will be flipped over and...

Страница 10: ...joist frame Parts Steps 10 11 Plywood Floor Large 45 3 8 x 74 7 8 x 3 Plywood Floor Small 45 3 8 x 20 7 8 x 3 Hardware Steps 10 11 S2 1 1 4 Screws x 70 total approx Important Make sure floor is level...

Страница 11: ...ermine proper wall position to confirm B Wall Section Exploded view of all parts necessary to complete the Wall Section Identify all parts prior to starting Rear Wall Panel 4 34 1 8 wide Front and Rea...

Страница 12: ...l walls are aligned in their upright position If not water may leak into your shed Unsure if panel is facing up or down Compare solid wall siding to window wall siding and match orientation Toll Free...

Страница 13: ...om middle and top of stud to secure properly Hardware Steps 16 18 S1 2 1 2 Screws x 21 total Rear Wall S i d e W a l l 17 With the corner wall attachment complete position a second Side Solid Wall Pan...

Страница 14: ...all attachments as per Steps 15 17 The rear wall is made up of four Rear Solid Wall Panels Pilot Hole first Pilot Hole first Pilot Hole first Toll Free 1 888 658 1658 www outdoorlivingtoday com sales...

Страница 15: ...les outdoorlivingtoday com Page 15 20 Position Door Header Short on top of wall stud so it is flush on the inside with 2x3 wall stud Attach by screwing down into top wall fram ing with 3 3 Screws Part...

Страница 16: ...um strip on back of Long Door Header 22 Attach Interior Door Header as shown above Align with top framing of front walls Attach with 4 2 1 2 Screws To complete Wall Section attach bottom 2x3 wall plat...

Страница 17: ...framing with 3 2 Screws per plate Parts Steps 24 25 Side Wall Top Plates 4 Angle Cut End 2 Straight Cut 3 4 x 2 1 2 x 32 x 6 Front Rear Wall Top Plates Angle Cut Edge 3 4 x 2 1 2 x 65 3 4 x 4 Hardwar...

Страница 18: ...Rear Top Plate attachments the same Male Female Gable Siding Overlap 26 Locate Triangular Gable Half Walls for both sides of the shed Align framing and wall siding lap together Screw center wall frami...

Страница 19: ...ttachment will be completed with an additional 6 Screws Screw from the bottom of Gable framing down into Top Wall Plate and Wall Framing Complete Gable positioning and attachment on the other side Hin...

Страница 20: ...Boards Long Ridge Boards Short and attach together with Metal Ridge Board Connector using 8 3 4 silver screws Position Metal Ridge Board Connector evenly on Ridge Boards Total length when connected is...

Страница 21: ...1 Attach end of a Soffit Board flush to ends of outside Rafters with 2 2 1 2 screws per rafter end Drill pilot hole in Soffit ends to prevent splitting Complete both outside Rafter Soffit connections...

Страница 22: ...rd slips into gable notch Soffit will sit approximately 1 8 away from wall panel Soffit Gable Notch Ridge Board Rafter Soffit should sit approx 1 8 away from wall panel End Rafter will sit flush with...

Страница 23: ...ld be 91 apart at top from inside of wall plate to wall plate Hardware Step 35 S2 1 1 4 Screws x 16 total Offset Metal Ridge Board Connectors Important If gable framing does not line up with Rafters r...

Страница 24: ...s per Double Bracket 2 Screws 2 Screw 2 Screw 1 1 4 Screw 2 Screws 1 1 4 Screw Hardware Step 38 S2 1 1 4 Screws x 8 total S3 2 Screws x 20 total Y30 Single Rafter Brackets x 4 total Y31 Double Rafter...

Страница 25: ...screw to hit the meat of the rafter 41 Locate one sheet of Roof Plywood Small Position above previous piece and attach with 8 1 1 4 screws Parts Roof Plywood Small 5 8 x 8 5 8 x 72 x 1 Hardware S2 1 1...

Страница 26: ...Steps 39 43 to complete opposite side of plywood roof Parts Roof Plywood Small 5 8 x 8 5 8 x 72 x 2 Roof Plywood Large 5 8 x 48 x 72 x 2 Hardware S2 1 1 4 Screws x 40 total Important Plywood roof pan...

Страница 27: ...Skirting Front 1 2 x 4 x 43 1 2 x 3 Bottom Skirting Rear 1 2 x 4 1 2 x 34 1 8 x 4 Hardware N1 1 1 2 Finishing Nails x 44 total Expert Advice When installing trim sort pieces according to color and pie...

Страница 28: ...1 1 2 Finishing Nails x 16 total 46 Attach Filler Trim to each corner side wall Align Filler Trim so it sits flush with the bottom of the last piece of Wall siding Attach with 8 1 1 2 Finishing Nails...

Страница 29: ...ware S2 1 1 4 Screws x 16 total 3 8 Gap between Track and Door Header Extra piece of lap siding can be used as a spacer 3 8 Door Header Front Soffit A wood clamp may be helpful to hold the track in pl...

Страница 30: ...s meet in the middle Left Side Door Parts Sliding Doors 36 x 73 x 2 Right Side Door Twist Roller Cart onto bolt After doors are hung you may need to adjust this until doors hang straight up and down a...

Страница 31: ...r Tracks should be flush with each other Secure Door Tracks to shed with 6 3 screws per piece Secure Door Stops with 2 3 screws per piece Parts Lower Door Track 1 1 2 x 1 5 8 x 60 x 2 Door Track Stops...

Страница 32: ...doors can not slide out of the track Secure each piece of Track Cover with 4 2 1 2 screws Parts Lower Door Track Cover 3 4 x 3 1 2 x 43 1 2 x 3 Hardware S1 2 1 2 Screws x 12 total Door Stop and Track...

Страница 33: ...door frame and attach with 5 1 1 4 Screws Parts Interior Door Flange 3 4 x 3 1 2 x 71 1 2 x 1 Hardware S2 1 1 4 Screws x 5 total Left Side Door Left Side Door Right Side Door Door Flange attaches to...

Страница 34: ...nd Rafter Align Wide Corner Trim with bottom of Corner Trim Corner Trim will cap the Wide Corner Trim Do a dry run in each cor ner before attaching to confirm positioning Use 8 1 1 2 Finishing Nails p...

Страница 35: ...all Narrow Trim 1 2 x 2 1 2 x 77 1 2 x 2 Hardware N1 1 1 2 Finishing Nails x 16 total Toll Free 1 888 658 1658 www outdoorlivingtoday com sales outdoorlivingtoday com Page 35 55 Attach Rear Wall Narro...

Страница 36: ...be covered in Step 60 Front Rear Facia May have gap Will get covered later Parts Facia Nailing Strips 3 4 x 2 1 2 x 51 x 4 Hardware S2 1 1 4 Screws x 16 total Parts Side Facia Angle Cut Ends 3 4 x 5 1...

Страница 37: ...zontal Gable Detail Plates to cover seams where Horizontal Gable Trims meet Secure with 4 1 1 2 Finishing Nails per piece Parts Facia Detail Plates 1 2 x 3 1 2 x 8 x 2 Horizontal Gable Plates 1 2 x 4...

Страница 38: ...Dab caulk in siding channel on both sides of window Run caulk in siding gap at top Requires a large amount Trim dado sits in flange 63 Position Window Trim around window doing a dry run first and att...

Страница 39: ...other proprietary notices contained on the materials No material may be modified edited or taken out of context such that its use creates a false or misleading statement or impression as to the posit...

Отзывы: