Outdoor Living Today www.outdoorlivingtoday.com [email protected]
Page 26
41.
Lift up, position and attach 2nd
Outside Roof Panel
on Rafters as per
Step 40
.
42.
Position and attach remaining Roof Panels as per
Steps 39 - 41.
Outside Panel
43.
Roof
Filler Shingles
are included to cover Roof seams. Starting at the bottom, slide the first
Long Shingle in until flush with other bottom Shingles.
Parts (Steps 43 - 45)
Filler Shingles - Long x 16
Filler Shingles - Short x 4
Hardware (Steps 43 - 45)
2 1/2” Screws
x 32 total
1 1/2” Shingle Nails
x 8 total
Shingles overhang Plywood
on Outside Roof Panel.
Middle Panel
Outside Panel