Toll Free 1-888-658-1658 www.outdoorlivingtoday.com [email protected]
Page 25
52.
Slide Roof Window up dado cut and gap of Rafters until it slides completely into dado cut of
Ridge Board.
Dado cut of Ridge Board
53.
With Window in position, use 2 - 1 1/2” finishing nails to secure. Window should be slightly
recessed or flush from end of Rafter and back approximately 1/4” from end of Outside Rafter.
Standing on ladder from inside the Greenhouse, caulk the Ridge Board / Window Seam.
Caulk seam
1 1/2” finishing nails
54.
Install additional Roof Polygal Window as shown above following
Steps 51-53.