manualshive.com logo in svg
background image

Outdoor Living Today                 www.outdoorlivingtoday.com            [email protected]

Page 1

8x4 SpaceSaver Garden Shed -

Double Door - Bevel Model

Assembly Manual

Revision #21

September 26, 2019

In the event of a missing or broken piece, simply call the Outdoor Living Today Customer
Support Line @ 1-888-658-1658 within 30 days of the delivery of your 
purchase. It is our commitment to you to courier replacement parts, free of charge, 
within 10 business days of this notification. Replacement parts will not be 
provided free of charge after the 30 day grace period. 

Thank you for purchasing
an 8x4 SpaceSaver Garden 
Shed. Please take the time 
to identify all the parts prior 
to assembly.

Please be aware that it is the
customers’ sole responsibility
to acquire the necessary
building permits and or obtain
approval from their local
county, municipality or HOA
prior to purchasing. Generally,
shed structures under 100
square feet do not require
permits in most jurisdictions
in the United States and
Canada.

Содержание 8x4 SpaceSaver Garden Shed

Страница 1: ...cement parts free of charge within 10 business days of this notification Replacement parts will not be provided free of charge after the 30 day grace period Thank you for purchasing an 8x4 SpaceSaver Garden Shed Please take the time to identify all the parts prior to assembly Please be aware that it is the customers sole responsibility to acquire the necessary building permits and or obtain approv...

Страница 2: ...ght Steps 38 40 4 5 Wide x 16 to 18 long Filler Shingles Steps 41 44 D Miscellaneous Section Skirting Trim Door Facia Misc Parts 6 x 4 x 45 Bottom Skirting Bevel Siding Steps 47 50 8 7 8 x 2 x 36 Corner Filler Trims 2 7 8 x 2 x 10 Rear Center Corner Filler Trims Steps 51 53 2 x 3 x 79 Vertical Door Trims Steps 54 55 2 x 5 x 79 Front Corner Trims 2 x 5 x 88 Rear Corner Trims 2 x 2 x 80 Side Front C...

Страница 3: ...it Provided Safety Glasses Work Gloves Safety Equipment Required Not Provided Ladder Screw Gun Drill Tape Measure Hammer Wood Clamp Level Pliers Tools Required Not Provided 1 8 1 2 Drill Bits Barrel Bolt Utility Knife 2 1 2 1 1 4 3 4 Simpson Strong Tie x 8 2 Cane Bolt 1 1 2 Finishing Nail 168 Pcs 115 Pcs 24 Pcs 38 Pcs 245 Pcs Tee Hinge x 6 Black Headed Black Headed ...

Страница 4: ... 1 2 x 72 as illustrated above Position Joists equally in Floor Joist Frame Use Small Floor Joist Frame as a template to determine joist position Position Joist so flush with framing 2 When correctly positioned attach each Joist with 4 2 1 2 screws 2 per end You can find the Square Drive Bit for the screws in with the Hardware Kit Bag Flush with framing Front of SpaceSaver Door Location Small Floo...

Страница 5: ...ur foundation Caution you may need 2 people to assist you Be careful when laying floor down not to bend or twist floor Note The floor will be flipped over and floor runners will sit on your foundation It is important to note that having a level foundation is critical Choosing a foundation will vary between regions Typical foundations can be concrete pads or patio stones positioned underneath the f...

Страница 6: ... Jambs 2 Narrow Wall Panel 2 Horizontal Wall Cleats Wall Extendors 2 Wall Plate 9 Locate 4 Solid Wall Panels and 4 Wall Plates 1 1 2 x 2 1 2 x 45 1 2 Attach Plates to bottom of studs of each wall panel with 3 2 1 2 screws Position so plates are flush with framing Door Header Short 2 Note Plywood is cut slightly smaller than floor framing Keep plywood seams tight Toll Free 1 888 658 1658 www outdoo...

Страница 7: ...oned correctly locate 2nd Solid Wall Panel and place in corner Wall Plate Flush with plywood floor Do not align wall siding to floor Align wall plate to outside of plywood floor 12 Butt both vertical wall studs of side and rear walls together and attach with 3 2 1 2 screws Screw at the bottom middle and top of stud to secure properly Have helper push wall framing together while securing to ensure ...

Страница 8: ... wall panel studs together as per Step 12 with 3 2 1 2 screws 14 With Rear Wall Panel in place position other side wall panel on floor as per Step 10 11 Rear Wall Panel 15 Secure side wall panel to rear wall panel as per Step 12 Next locate a Narrow Wall Panel and position in front corner Toll Free 1 888 658 1658 www outdoorlivingtoday com sales outdoorlivingtoday com Page 8 Do Not Attach Walls To...

Страница 9: ...w from top down into wall framing Align to inside of wall framing and tight against side wall 18 Complete opposite Narrow Wall as per Steps 16 17 17 When correctly positioned secure Narrow Wall Stud to Side Wall Stud with 3 2 1 2 screws 2x3 wall plate flush with plywood floor Toll Free 1 888 658 1658 www outdoorlivingtoday com sales outdoorlivingtoday com Page 9 Step to front and top Pilot Hole fi...

Страница 10: ... inside of shed Attach using 2 2 1 2 screws per end as shown above Hint Have 2 helpers push Side Walls together to close any gaps between Headers Complete both sides Attach support strip to short headers with 2 3 4 screws 21 Locate both Vertical Door Jambs 1 1 2 x 3 1 2 x 73 and position flush against front narrow wall stud The Jamb will sit flush to outside of wall siding When positioned correctl...

Страница 11: ...to back 24 With Angled Wall Extendor and Side Wall aligned correctly secure together from the inside with 4 2 1 2 screws 25 Complete opposite Angled Wall Extendor positioning and attachment as per Steps 23 24 Toll Free 1 888 658 1658 www outdoorlivingtoday com sales outdoorlivingtoday com Page 11 Wall framings flush Siding lines up Sidings will overlap ...

Страница 12: ...all framing aligned attach Wall Extendor to both the Angled Wall Extendor framing and the rear wall framing with 5 2 1 2 screws 28 Position and secure 2nd Wall Extendor Panel as per Steps 26 27 Additionally attach to first Extendor with 2 2 1 2 screws Toll Free 1 888 658 1658 www outdoorlivingtoday com sales outdoorlivingtoday com Page 12 Pilot Hole first Pilot Hole first ...

Страница 13: ...loor Refer to Step 11 Wall siding should overhang floor while 2x3 wall plates should sit flush with floor C Rafter and Roof Section Exploded view of all parts necessary to complete the Rafter and Roof Section Identify all parts prior to starting Left Roof Panel Right Roof Panel Rear Soffit 2 3 wide Rafters 6 Front Soffit 2 3 1 2 wide Simpson Strong Ties 8 Confirm Doorway opening is 64 wide at top ...

Страница 14: ...ent splitting Measure and attach interior Rafters as illustrated above Measure and attach remaining Soffit Rafter connections using 2 1 1 4 screws per rafter soffit 3 1 2 wide 3 wide 3 wide Rear Soffit Board 2 3 1 2 wide Front Soffit Board 2 48 21 3 4 21 3 4 96 A B C Front Soffit Mid Rafter Mid Rafter Front 3 wide Soffit 2 Screw center rafters togeth er with 3 2 1 2 screws Confirm correct end of r...

Страница 15: ...aceSaver Toll Free 1 888 658 1658 www outdoorlivingtoday com sales outdoorlivingtoday com Page 15 Rafter sits on framing 3 1 2 Wide Soffit to the front 33 Position completed Rafter Section on top of walls Outside Rafters will sit on Extension Wall framing and be positioned equally from side to side 34 When Rafter Section is positioned correctly both Front and Rear Soffits will sit approximately 1 ...

Страница 16: ...tely secure remaining interior rafters using 6 2 1 2 Screws Screw into rafters from inside of Header on an angle at front of shed and from inside of Extension Wall Framing at rear of shed Front Front Shingle overhang In s id e S h in g le s fl u s h Outside Side 37 Carefully flip Roof Panels over so plywood sheathing is facing up Center Rafter Facia Nailing Plates 2 3 4 x 3 4 x 48 onto outside of ...

Страница 17: ... rafter end Plywood flush with shingles on inside 39 For correct Roof Panel position align panel so plywood sits evenly on Center Rafters Complete both roof Panels Roof Panel centered on rafter Roof Seam 40 With Roof Panels aligned screw panels down to center rafters with 2 2 1 2 screws in Bottom Row of Shingles Only 1 screw per panel Screw Bottom Row of Shingles ONLY for now Screw on angle away f...

Страница 18: ...888 658 1658 www outdoorlivingtoday com sales outdoorlivingtoday com Page 18 42 Screw first filler shingle down to rafters using 1 2 1 2 screw per panel 2 in total Screw on slight angle and make sure to screw into rafter Screw slightly above 3rd row of shingles exposure line This way the screw will get covered up when you install your 2nd Filler Shingle and will prevent leaking Tip Butt thicker 1s...

Страница 19: ... if possible have a helper push roof panel down so plywood sits flush against rafter while securing Mid Rafter Plywood 3 2 1 2 screws Toe Nailed in each Mid Rafter Toll Free 1 888 658 1658 www outdoorlivingtoday com sales outdoorlivingtoday com Page 19 44 Slide 3rd and 4th Filler Shingles up and underneath appropriate shingle rows and follow Steps 41 42 to align and attach On last filler screws wi...

Страница 20: ...d Front Rear Side Skirting 6 Full Door 2 Black Tee Hinge 6 Door Hardware Vertical Door Trim 2 Front Rear Facia Detail Plate Front Facia 2 47 Attach Bottom Skirting 3 4 x 4 1 2 x 45 1 4 bevel around the base of the shed Skirting will hide floor framing Start with side skirting pieces first and attach with 4 1 1 2 finishing nails per piece Toll Free 1 888 658 1658 www outdoorlivingtoday com sales ou...

Страница 21: ...7 8 x 2 1 2 x 36 Fillers are essentially nailing strips and will not be visible once additional corner trims are attached later Rear Skirting Gap Side Skirting Skirting meets flush in center Corner Filler Trim Toll Free 1 888 658 1658 www outdoorlivingtoday com sales outdoorlivingtoday com Page 21 Skirting meets flush in center 50 Use 6 nails on front skirting piece where doors will be installed T...

Страница 22: ...nter Corner Filler Trim that you will need to center and attach as well using 2 1 1 2 nails 54 Locate Vertical Door Trim 2 1 2 x 3 1 2 x 79 Position Door Trim flush with outside of narrow wall stud Trim should be aligned tight underneath Soffit Attach with 8 1 1 2 finishing nails Flush with Narrow Wall stud Vertical Door Trim Toll Free 1 888 658 1658 www outdoorlivingtoday com sales outdoorlivingt...

Страница 23: ...1 1 2 nails aligning at bottom with wide trim 5 1 2 Side Skirting 58 To completely trim out rear corners locate Side Rear Corner Trims 1 2 x 2 1 2 x 88 3 4 and Rear Corner Trims 1 2 x 5 1 2 x 88 3 4 Align and attach as per Step 57 Right Side Door Trim Flush with Door Jamb Toll Free 1 888 658 1658 www outdoorlivingtoday com sales outdoorlivingtoday com Page 23 56 To completely trim out front corner...

Страница 24: ...shown above and attach with Black 3 4 and 2 screws Important Drill Pilot Holes to prevent splitting 60 To trim out door locate Horizontal Door Trim 1 2 x 1 1 4 x 64 and both Horizontal Narrow Wall Trims 1 2 x 2 1 2 x 8 1 2 Position as shown above and attach with 1 1 2 finishing nails Toll Free 1 888 658 1658 www outdoorlivingtoday com sales outdoorlivingtoday com Page 24 Hor Door Trim At top of do...

Страница 25: ...iding or shingle to shim door in place at the bottom Using 2 black screws secure bottom hinge to Door Trim Hint Do not attach all the 2 screws until both doors are positioned correctly You can use a Screw Driver to tighten screws completely so you don t over tighten Bottom of Door 3 8 gap on side 1 2 gap at bottom 2 Black Screws Important Drill Pilot holes to prevent splitting 62 With Hinges attac...

Страница 26: ...cia underneath roof panel against Rafter Facia Nailing Plate Align so Front Facia caps Side Facia and then attach the front with 6 1 1 2 finishing nails Attach side with 5 1 1 2 nails securing them into the nailing plate closer to the top of the side facia board Attach next piece of Front Facia Note With Front Facia correctly aligned at corners a small gap may occur at center seam This will be cov...

Страница 27: ... Plates to cover seams where Front and Rear Facia pieces come together Secure with 4 1 1 2 finishing nails per piece 71 Attach Upper Interior Door Trim 2 1 2 x 1 2 x 28 7 8 positioning 1st trim against door jamb and underneath door header flush to edges on inside as shown to the right Attach with 4 1 1 2 finishing nails Flush with header and jamb Toll Free 1 888 658 1658 www outdoorlivingtoday com...

Страница 28: ...erior Door Trim 4 1 2 x 1 2 x 35 7 8 2 per side Position against door jamb and underneath upper door trim Attach with 4 1 1 2 finishing nails Complete lower interior door trim and both side interior trims on other side Lower interior door trim 73 Attach Upper Door Stop dado cut 1 1 2 x 2 1 2 x 6 underneath door header with 2 2 1 2 screws Stop is pre drilled on angle Evenly space between trim Door ...

Страница 29: ...ce complete open doors and drill hole where previously marked with 1 2 bit 2 Black Screws 2 Black Screws 1 3 4 Black Screw Toll Free 1 888 658 1658 www outdoorlivingtoday com sales outdoorlivingtoday com Page 29 Drill 1 2 Diameter Hole to accommodate rod of Cane Bolt 76 To secure doors you will need to install the Interior Cane Bolt to the Vertical Door Flange First slide bolt through the upper an...

Страница 30: ...e 2 On Time Shipping 3 Motor Freight Delivery 4 Quality of Materials 5 Assembly Manual 6 Overall Satisfaction The materials contained in this Assembly Manual may be downloaded or copied provided that ALL copies retain the copyright and any other proprietary notices contained on the materials No material may be modified edited or taken out of context such that its use creates a false or misleading ...

Отзывы: