2.
Locate
Part B’s - 96” long (2 Pcs)
and
91 1/2” long Canopy Tracks (2 Pcs)
as well as
4” long
x 1/4” diameter Plastic Track Connector (2 Pcs).
Starting with the 96” track, orientate track so end
with counter sunk hole 2 3/4” from end is flush against pergola girder. Screw to post with 1 - 1 1/4”
brown screw. Make sure track end is tight against end of girder before screwing. Screw opposite end
of track to mid post with 1- 1 1/4” brown screw in tracks counter sunk hole. Locate 4” long
Plastic Connector and slide into hole in track bottom until about halfway.
2 Ladders and an assistant
required now!
1.
With a Step Ladder, install
Part A - Canopy Lowering Cleats - 5 pcs. (1 1/2” x 2 1/2” x 8 1/2”)
with
2 - 4” screws.
Cleats will lower the canopy on one side and drain water off the fabric so it
doesn’t collect excessively. Decide best side for water to drain for your situation. Position cleats
underneath pergola joists or blocking as shown above and attach. Cleats are pre-drilled 3/4” from
each end.
5 Cleats
Toll Free 1-888-658-1658 www.outdoorlivingtoday.com [email protected]
Page 5
Counter sunk
drill holes.
96” Track
4” Connector
Blocking
Aligned with Blocking
1 1/4” Brown
Screw. Track
Counter Sunk
2 3/4” from end.
Flush
1 1/4” Brown
Screw. Track
Counter Sunk
3/4” from end.
Check that pergola is level prior to
installing lowering cleats. Install
cleats on low side to ensure proper
canopy water drainage.