background image

Parts (Step 82)

 

Regular Window Trim 

x 2

Hardware (Step 82) 

N1 -1 1/2” Finishing Nails

 

x 32 total 

82. 

 Position 

Window Trim

 around window doing a dry run first and 

attach with 

4 - 1 1/2” Finishing Nails

 per piece.The regular window kit is 

1” x 24 1/16”=top (angle cut on ends), 3” x 23” = Sides and Bottom. 
Window trim has a small dado on reverse face. Outside flange of window 
will roughly sit in the dado to give a better fit. 

Trim dado 
sits in flange.

Parts (Step 83)

 

Flower Box Kits 

x 2 

Hardware (Step 83) 

S1 - 2 1/2” Screws

 

x 4 total 

83. 

 Assemble 

Flower Box Kits

 with Assembly Instructions included 

on Page 46. Position completed Flower Box below bottom of window 
trim and secure with 

2 - 2 1/2” screws

. Screw from inside of box into 

the center wall stud. Attach second screw 2” underneath first screw and 
once again into the wall stud. Install Flower Box Kits underneath each 
window. 

Congratulations on completing 
your new 12 x 12 Spacemaker 
Garden Shed!

  Toll Free 1-888-658-1658              www.outdoorlivingtoday.com        [email protected]

Page 44

Содержание 12x12 SpaceMaker Garden Shed

Страница 1: ...e of any liability for improper installation maintenance and repair of any of our products Snow load ratings vary by geographical location If heavy or wet snowfall occurs it is advisable to sweep the...

Страница 2: ...e on the type of foundation you will be using Concrete slab or 4 6 inches of crushed gravel with paver stones or 4x4 stringers You can nd the footprint for your shed on Page 3 of your Assembly Manual...

Страница 3: ...paced with one at each end of floor frame Saves money on materials easy to level and work with Gravel with Patio Paver Stones Excavate at least 6 deep and 6 wider than floor frame on each side 3 0 Cub...

Страница 4: ...tached Top Wall Plates Gables 4 1 1 2 x 2 1 2 x 70 3 4 Front Rear Riser Plates 4 1 1 2 x 2 1 2 x 65 3 4 Side Riser Plates 4 3 4 x 2 1 2 x 45 Front Rear Top Plates angle cut ends 2 3 4 x 2 1 2 x 51 1 2...

Страница 5: ...led 4 3 4 x 5 1 2 x 71 1 4 Side Facia 2 9 1 2 x 7 3 8 Pentagon Detail Plates 2 8 x 5 1 2 Facia Detail Plates 4 8 x 4 1 2 Front Rear Detail Plates Miscellaneous 2 31 1 2 x 72 Left Right Doors 1 each 2...

Страница 6: ...Hinge x6 Pull Handle x 2 Ridge Board Connector x 3 Silver Square Drive Bit Hardware Kit Provided Black Barrel Bolt Silicon Caulking 1 1 2 Finishing 400 pcs 245 pcs 39 pcs 560 pcs 24 pcs 23 pcs 650 pc...

Страница 7: ...h off dirt from walls Brush off snow from roof regularly Routinely remove needles and leaves from roof Painting Staining Your cedar shed if left untreated will weather to a silvery grey color Painting...

Страница 8: ...ground as illustrated above Position 72 Floor Joists in 75 frames and 63 1 2 Floor Joists in 66 1 2 frames Position Joists equally in Floor Joist Frame Position Joist so flush with framing Flush with...

Страница 9: ...Bit for the screws in with the Hardware Kit Bag 4 Attach each completed section together with 16 2 1 2 screws as illus trated above Hardware Step 4 S1 2 1 2 Screws x 32 total Toll Free 1 888 658 1658...

Страница 10: ...Caution you will need 2 people to assist you Be careful when laying floor down not to bend or twist floor When in place level floor completely Toll Free 1 888 658 1658 www outdoorlivingtoday com sales...

Страница 11: ...rtant Check to confirm that your floor is level prior to proceeding to the next step of wall assembly 141 1 2 182 Front of Shed B Wall Section Solid Wall Panels 9 1 with 2 extra studs Side Riser Plate...

Страница 12: ...d Walls Important Pilot hole ALL 2x3 Wall Studs with 1 8 drill bit prior to screwing This will make it much easier to attached together Pilot Hole Plate first Parts Step 9 Solid Wall Panels 45 1 2 x 8...

Страница 13: ...l Panel so bottom 2x3 wall framing is sitting flush with outside floor frame Wall siding should overhang floor by approximately 1 2 Attach rear wall panel studs together as per Step 11 2x3 wall framin...

Страница 14: ...Wall Panels At the front of the shed side walls will sit flush with front floor framing Wall panel will sit flush with floor framing at front of shed 16 Secure remaining two Narrow Window Walls to bot...

Страница 15: ...ep 17 S1 2 1 2 Screws x 8 total Door Jamb sits flush with wall framing and tips of bevel siding 18 Position and attach Door Header Riser to Door Jamb and Narrow Wall Panel top framing Header should fi...

Страница 16: ...x 70 x 2 Hardware Step 19 20 S3 2 Screws x 13 total 20 Place assembled Door Header onto Door Header Riser and attach with 7 2 screws 21 Locate Drip Edge with Bevel Siding attached Attach to Door Heade...

Страница 17: ...ceeding Optional Caulking seams will help prevent moisture from entering your shed Caulking is included to complete roof only Additional Caulking may be required Caulking Angle screws into perimeter F...

Страница 18: ...ides of shed Parts Steps 24 Side Riser Plates 1 1 2 x 2 1 2 x 65 3 4 x 4 Hardware Steps 24 S3 2 Screws x 24 total 25 Position and attach Front Rear Top Plates There are two pieces with angle cut ends...

Страница 19: ...ide plates flush 27 Locate Triangular Gable Half Walls for both sides of shed Align framing and wall siding lap together Screw center wall framing of each piece together with 4 2 1 2 screws Note Prior...

Страница 20: ...n attachment will be completed with an additional 6 screws Screw from the bottom of Gable framing down into Top Wall Plate and Wall Framing Complete Gable positioning and attachment on the other side...

Страница 21: ...ffits C Rafter Section Ridge Boards 68 1 4 2 Ridge Boards 45 1 2 3 Gussets 3 Rafters 18 29 Locate Ridge Boards and attach together using Metal Ridge Board Connectors and 8 3 4 screws evenly spaced on...

Страница 22: ...S2 1 1 4 Screws x 48 total 31 Attach completed Ridge Board to ends of both outside Rafters with 2 2 screws per end Measure and position interior Rafters as illustrated above When positioned correctly...

Страница 23: ...ws rafter Important Pilot Hole Soffits to prevent splitting Important Pilot hole Soffit to prevent splitting 33 Complete second Rafter section following Steps 30 32 136 1 2 45 5 20 5 20 5 20 5 20 5 20...

Страница 24: ...e resting on Top Plate Gable Notch Slide bottom of Ridge Board into notch of Gable Slight gap between Wall and Soffit 36 Lift second Rafter Section up and place on Gable Framing Slide Rafter Section u...

Страница 25: ...using a clamp to hold the Ridge Boards together flush while screwing Stagger screw position vertically on Ridge Board to create a stronger connection Complete both sides Important if there is a gap b...

Страница 26: ...and then secure 40 Start by attaching one Gusset onto the mid dle Rafters as illustrated Attach only 1 2 screw per side now Important Pilot hole Gussets to prevent splitting Parts Steps 40 41 Gussets...

Страница 27: ...42 Y30 Single Rafter Bracket x 6 total Y31 Double Rafter Bracket x 4 total S2 1 1 4 Screws x 12 total S3 2 Screws x 36 total 42 Attach all Single and Double Rafter Brackets where Rafters meet Top Wall...

Страница 28: ...4 x 3 1 2 x 45 1 2 x 10 Parts Steps 43 48 Batten Spacers 3 4 x 1 1 2 x 15 3 4 x 16 Hardware Steps 43 48 S2 1 1 4 Screws x 112 total D Roof Section Metal Ridge Caps 3 Metal Roof Panels Long 86 8 Roof B...

Страница 29: ...utside Rafter Batten Spacer allows you to line up next row of Battens Attach each Batten Spacer with 2 1 1 4 screws 46 Locate 2 more Outside Roof Battens and 1 Inside Roof Batten Place outside Battens...

Страница 30: ...tens on out side Rafter Attach Batten Spacers to outside Rafter with 2 1 1 4 screws per spacer Locate 2 more Outside Roof Battens and 1 more Inside Roof Batten Attach row of Battens to Rafter with 9 1...

Страница 31: ...l Roof Panels Long 86 long x 8 Hardware Steps 49 54 2 Metal Roof Screws x 60 total Hardware Steps 49 54 Metal Roof Hangers x 4 total Metal Roof Panels overlap each other 50 Metal Roof Panels overhang...

Страница 32: ...each panel to seal the joints Place panels down one by one once seam is caulked You will likely need assistance from a helper for this step Bead of caulking Bead of caulking Important Metal Roof Hanga...

Страница 33: ...he cap approximately 1 2 past each end When ridge cap is correctly positioned secure with 18 2 long self tapping metal screws using 1 4 nut driver 9 side Screw into final Battens into center of Batten...

Страница 34: ...st Install trim to most visible sides as your skill installing trim improves Double Door with Hardware 1 Reg Windows 2 Reg Windows Trims 2 Wide Corner Trim 4 Bottom Skirting 14 Side Trims 8 Facia Nail...

Страница 35: ...f Shed Side of Shed Rear of Shed 58 Attach Bottom Skirting Bevel below the two front Narrow Window Walls Attach with 4 1 1 2 finishing nails per piece Parts Step 58 Bottom Skirting Bevel 7 8 x 4 1 2 x...

Страница 36: ...thick end of Bevel downwards at top of wall tight against Soffits Attach with 4 1 1 2 Finishing Nails per piece Complete both sides Parts Step 62 Horizontal Gable Trims Bevel 3 4 x 4 1 2 x 45 1 4 x 3...

Страница 37: ...Parts Step 64 Wide Corner Trims 1 2 x 5 1 2 x 90 x 4 Hardware Step 64 N1 1 1 2 Finishing Nails x 32 total 64 Attach Wide Corner Trims over Filler Trims Wide Trim will cap Side Trims Attach with 8 1 1...

Страница 38: ...underside of Battens flush edge to edge Repeat this step on rear of shed Fasten each cleat with 3 1 1 4 screws per piece Parts Step 68 70 F R Facia angled ends 3 4 x 5 1 2 x 81 1 4 x 4 Hardware Step...

Страница 39: ...cia will cap Front and Rear Facia 70 Attach remaining Front Rear Facia pieces to Facia Cleats under Roof Battens with 10 1 1 2 Finishing Nails Once again line up Facia so it is aligned with Rafter end...

Страница 40: ...dware provided Note illustration of Hinge may not be accurate The of screw holes in the hinge may vary from three to four depending on model 3 4 Screw 2 Screws 73 Attach Door Hinges to both Left and R...

Страница 41: ...ning complete all 2 Black Screw attachments Note Do not over tighten hinge screws when using screw gun Tighten 3 4 of the way and use a Screw Driver to finish so as not to strip screws 76 Attach Horiz...

Страница 42: ...lange 1 2 x 2 1 2 x 71 x 1 Hardware Step 78 S3 2 Screws x 6 total 79 The Interior Cane Bolt will be attached to Vertical Door Flange To position Cane Bolt correctly attach to flange first close doors...

Страница 43: ...th screws to prevent wood splitting Hardware Step 80 Y3 Door Handles x 2 total Y4 Barrel Bolt x 1 total SB1 3 4 Black Screws x 9 total SB2 2 Black Screws x 5 total Parts Step 81 Regular Window Inserts...

Страница 44: ...t Trim dado sits in flange Parts Step 83 Flower Box Kits x 2 Hardware Step 83 S1 2 1 2 Screws x 4 total 83 Assemble Flower Box Kits with Assembly Instructions included on Page 46 Position completed Fl...

Страница 45: ...ps 3 On a flat surface flip Flower Box on it s rear face Evenly space Brackets and secure through Base Frame and into the Brackets with 2 1 1 4 screws per Bracket Position completed Flower Box beneath...

Страница 46: ...ntext such that its use creates a false or misleading statement or impression as to the positions statements or actions Note Our Sheds are shipped as an unfinished product If exposed to the elements t...

Отзывы: