Page 6
For technical questions, please call 1-888-866-5797.
Item 57574
Specifications
Connection
CGA 510
Setup
Read the ENTIRE IMPORTANT SAFETY INFORMATION section at the beginning of this
manual including all text under subheadings therein before set up or use of this product.
Workpiece and Work Area Setup
1. Designate a work area that is clean and well-lit.
The work area must not allow access by children
or pets to prevent distraction and injury.
2. Remove all combustible material from area and/
or cover surfaces with fire resistant material.
3. The work area must have a fireproof floor.
4. Secure loose workpieces using a vise or clamps
(not included) to prevent movement while working.
Note:
Proper weld preparation can be complicated,
and is outside the scope of this manual.
Tool Set Up
Read the ENTIRE IMPORTANT SAFETY INFORMATION section at the beginning of this
manual including all text under subheadings therein before set up or use of this product.
TO PREVENT SERIOUS INJURY FROM EXPLOSION:
Turn the Oxygen and Acetylene Regulator Valves fully clockwise to close
(oxygen first and acetylene second) before making any adjustments or
performing any inspection or service to this product.
1. Secure cylinders to a cart, wall, or post to
prevent them from falling.
Do not place
Acetylene Cylinder on its side.
WARNING! TO PREVENT FIRE AND EXPLOSION:
Make sure there is no oil, grease, or ignition source
(such as a hot weld, electric motor, or
another welding operation) nearby before
proceeding with the next step.
2. While standing to one side, “crack” cylinder valve.
“Cracking” is to quickly open and close the valve,
allowing a small amount of gas to escape and
clearing the valve of any foreign material.
WARNING!
If oil or grease is found,
discontinue using cylinder and
immediately contact your gas supplier.
Briefly open valve to clean,
then close valve.
Figure A: Crack Each Cylinder Valve
3. Attach the Red labeled Acetylene Regulator to the
Acetylene Cylinder,
tighten counterclockwise
- threads are reversed
.
No Leaks Found
If the leak testing has been completed and the unit is
found to be working properly, open the cylinder valve,
turning counterclockwise, and proceed to operation.
WARNING! Only open Acetylene Cylinder Valve
1/4 to 1/2 turn to allow quick shutoff.
Acetylene
Cylinder
Figure B: Open Cylinder Valve Only
After Testing Confirms There Are No Leaks