background image

3. OTHER MAINTENANCE ITEM

Field Service 

V

er. 1.0 Jul. 2009

16

FS-529

MAINTENANCE

3.3.11

Tray up/down motor (M2)

1.

Remove the rear cover.

See P.8

2.

Remove the upper cover.

See P.7

3.

Remove the FS control board.

See P.14

4.

Remove the conveyance roller unit.

See P.9

5.

Remove the harness guide.

See P.27

6.

Remove three screws [1], and 
remove the rear rail [2].

7.

Remove the screw [1], and remove 
the rear sub cover [2].

A

0U7F2C0

33

D

A

[1]

[2]

A

0U7F2C016D

A

[1]

[2]

Service Manual                                           Y111310-1

Содержание FS-529

Страница 1: ...FS 529 Option Printer SERVICE MANUAL Code Y111310 1...

Страница 2: ...PUBLICATION ISSUED BY Olivetti S p A 77 Via Jervis 10015 Ivrea TO Italy Copyright 2009 Olivetti All rights reserved...

Страница 3: ...reassembly procedure 6 3 3 1 Front left cover 6 3 3 2 Front right cover 6 3 3 3 Upper cover 7 3 3 4 Rear cover 8 3 3 5 Finisher 8 3 3 6 Conveyance roller unit 9 3 3 7 Stapler unit 10 3 3 8 Paper exit...

Страница 4: ...FS 529 OUTLINE MAINTENANCE Field Service Ver 1 0 Jul 2009 ii Blank Page...

Страница 5: ...X 8 1 2 8 1 2 X 11S 8 1 2 X 11 8 1 2 X 14 11 X 17 12 1 4 X 18 Max 311 15 mm X 1200 mm 12 25 inch X 47 24 inch Min 90 mm X 139 7 mm 3 54 inch X 5 5 inch Plain paper 60 to 90 g m2 16 to 24 lb 300 sheet...

Страница 6: ...e stapled Letter S A4S 8 1 2 X 11S or less 50 sheets Legal B4 8 1 2 X 14 or greater 30 sheets 60 to 90 g m2 16 to 24 lb 48 sheets 2 sheets 209 g m2 55 5 lb Stapling position Back of the corner Front o...

Страница 7: ...ENANCE PROCEDURE 2 1 Paper exit section NOTE The alcohol described in the cleaning procedure of maintenance represents the isopropyl alcohol 2 1 1 Cleaning procedure for each parts A Periodically clea...

Страница 8: ...red in order to prevent them from being removed by mistake Do not remove or loosen any of the red painted screws in the field It should also be noted that when two or more screws are used for a singl...

Страница 9: ...Units Finisher P 8 Conveyance roller unit P 9 Stapler unit P 10 Paper exit tray unit P 11 Board and etc FS control board FSCB P 14 Pick up roller position motor M1 P 15 Tray up down motor M2 P 16 Conv...

Страница 10: ...move the screw 1 and two tabs 2 and remove the front left cover 3 2 Reinstall the above parts following the removal steps in reverse 3 3 2 Front right cover 1 Remove two screws 1 and remove the front...

Страница 11: ...1 Remove the front left cover See P 6 2 Remove the rear cover See P 8 3 Remove the screw 1 and remove the cover 2 4 Remove six screws 1 and remove the upper cover 2 5 Reinstall the above parts followi...

Страница 12: ...3 3 4 Rear cover 1 Remove three screws 1 and remove the rear cover 2 2 Reinstall the above parts following the removal steps in reverse 3 3 5 Finisher 1 Remove the relay cord 1 2 Remove the ozone filt...

Страница 13: ...1 and remove the finisher 2 5 Reinstall the above parts following the removal steps in reverse 3 3 6 Conveyance roller unit 1 Remove the front right cover See P 6 2 Remove three screws 1 and remove th...

Страница 14: ...Remove the conveyance roller unit See P 9 3 Move the stapler unit 1 to the marked position 2 4 Put the finisher as shown in the illus tration and remove two screws 2 from the screw access holes 1 on...

Страница 15: ...onnectors 3 8 Remove the stapler unit 4 9 Reinstall the above parts following the removal steps in reverse 3 3 8 Paper exit tray unit 1 Remove the front left cover See P 6 2 Remove the rear cover See...

Страница 16: ...two screws 1 and remove the exit roller cover 2 6 Remove four screws 1 and remove the plate 2 7 Remove the screw 1 and remove the rear sub cover 2 8 Press the dowel 1 and remove the cover rail 2 A0U7F...

Страница 17: ...wn by the arrow and raise the exit tray 2 10 Unhook two shutter tabs 3 11 Turn the motor 1 further and raise the exit tray 2 12 Raise the exit tray 1 until the spring tension becomes weak as shown in...

Страница 18: ...rts following the removal steps in reverse 3 3 9 FS control board FSCB 1 Remove the rear cover See P 8 2 Remove all connectors from the FS control board 3 Remove the screw 1 and two board supports 2 a...

Страница 19: ...front left cover See P 6 2 Disconnect the connector 1 3 Remove three screws 2 and remove the pick up roller position motor assy 3 4 Remove two screws 1 and remove the pick up roller position motor 2...

Страница 20: ...ver See P 8 2 Remove the upper cover See P 7 3 Remove the FS control board See P 14 4 Remove the conveyance roller unit See P 9 5 Remove the harness guide See P 27 6 Remove three screws 1 and remove t...

Страница 21: ...OTE When removing the tray up down motor assy 2 the exit tray 3 bounces Be sure to press the exit tray 3 down when removing the tray up down motor assy 2 9 Remove two screws 1 and remove the tray up d...

Страница 22: ...S control board See P 14 4 Remove the harness guide See P 27 5 Remove three screws 1 and remove the rear rail 2 6 Remove two screws 1 and remove the sensor assy 2 7 Disconnect the connector 1 8 Remove...

Страница 23: ...r unit See P 9 3 Remove the flapper solenoid See P 24 4 Remove the conveyance motor 1 See P 18 5 Remove two screws 1 and the sole noid mounting plate 2 6 Disconnect the connector 1 7 Remove three scre...

Страница 24: ...ear cover See P 8 3 Remove the upper cover See P 7 4 Remove the pick up roller position motor See P 15 5 Disconnect the connector CN18 1 of the FS control board 6 Remove the screw 1 7 Remove the harne...

Страница 25: ...following the removal steps in reverse 3 3 15 Fan motor FM1 1 Remove the front left cover See P 6 2 Remove the conveyance roller unit See P 9 3 Remove the belt retract solenoid See P 26 4 Remove the...

Страница 26: ...gears 2 NOTE Be careful not to lose the pin 10 Remove the bushing 1 11 Remove two screws 2 and remove the gear assy 3 12 Remove the harness from two wire saddles 1 13 Disconnect the connector 2 14 Re...

Страница 27: ...board See P 14 4 Remove the conveyance roller unit See P 9 5 Remove the harness guide See P 27 6 Remove three screws 1 and remove the rear rail 2 7 Remove the harness from three wire saddles 1 8 Remov...

Страница 28: ...move the rear rail 2 4 Remove the harness from four wire saddles 1 5 Disconnect the connector 2 6 Disconnect the connector CN16 3 of the FS control board 7 Remove two screws 4 and remove the sensor as...

Страница 29: ...P 8 2 Remove the screw 1 and remove the cover 2 3 Illuminate the inside from the open ing 1 shown in the illustration 4 Remove the flapper solenoid 2 5 Make sure that the flapper 1 and the damper 2 a...

Страница 30: ...t left cover See P 6 2 Remove the spring 1 and remove the lever 2 3 Remove the harness from the wire saddle 1 4 Disconnect the connector 2 5 Remove the screw 3 and remove the belt retract solenoid 4 6...

Страница 31: ...oard See P 14 3 Disconnect the connector 1 4 Remove the harness from two wire saddles 2 5 Remove the screw 3 and remove the ground terminal 4 6 Remove all harness from the harness guide 5 7 Remove the...

Страница 32: ...3 OTHER MAINTENANCE ITEM Field Service Ver 1 0 Jul 2009 28 FS 529 MAINTENANCE Blank Page Service Manual Y111310 1...

Страница 33: ...UPDATING STATUS DATE UPDATED PAGES PAGES CODE 09 2009 1ST EDITION 33 Y111310 1...

Отзывы: