3NB/3ND/3N0/3NK
2-1-21
2-1-7 Punch unit(Option)
The punch unit is installed on the paper insertion section of the finisher. It stops paper conveyance and
punches paper.
.
Figure 2-1-26 Punch unit
1
4
5
2
3
1. Punch cam
2. Punch cutter
3. Punch waste box
4. Punch home position sensor(PUHPS)
5. Punch plus sensor(PUPS)
Service Manual Y113480-7
Содержание DF-790
Страница 1: ...SERVICE MANUAL Options DF 790 BF 730 MT 730 AK 730 PH 7C Code Y113480 7...
Страница 4: ...This page is intentionally left blank...
Страница 10: ...This page is intentionally left blank...
Страница 30: ...3NB 3ND 3N0 3NK 1 2 12 5 Remove tape from the bridge drive unit Figure 1 2 15 Tape Service Manual Y113480 7...
Страница 32: ...3NB 3ND 3N0 3NK 1 2 14 3 Remove tape and pad Figure 1 2 18 Tape Pad Service Manual Y113480 7...
Страница 34: ...3NB 3ND 3N0 3NK 1 2 16 This page is intentionally left blank Service Manual Y113480 7...
Страница 53: ...3NB 3ND 3N0 3NK 1 3 19 This page is intentionally left blank Y113480 7 Sevice Manual...
Страница 87: ...3NB 3ND 3N0 3NK 1 4 34 This page is intentionally left blank Y113480 7 Sevice Manual...
Страница 93: ...3NB 3ND 3N0 3NK 1 5 6 This page is intentionally left blank Y113480 7 Sevice Manual...
Страница 127: ...3NB 3ND 3N0 3NK 2 2 10 This page is intentionally left blank Y113480 7 Sevice Manual...
Страница 149: ...3NB 3ND 3N0 3NK 2 3 22 This page is intentionally left blank Y113480 7 Sevice Manual...