30
ENGLISH
To prevent the creation of large amounts of dust and rubble due to drilling
the core borer can be
¿
tted
Z
ith a vacuum s
\
stem
applied b
\
means of suction cups to the drilling zone.
To drill the holes
proceed as follo
Z
s:
Fasten the drilling template to the
Z
all leaving the necessar
\
space from the ceiling
À
oor and side
Z
alls as sho
Z
n on the template
that ma
\
be
¿
xed using adhesive tape.
Use a small drill or punch to mark
Z
ith extreme care
the exact centre of each of the holes to be drilled.
Using a core boring head measuring at least 162 mm to drill the t
Z
o holes for entr
\
and exit of the air.
WARNING:
GULOOWKHIRUHJRLQJKROHVWLOWHGVOLJKWO\GRZQZDUGVWRSUHYHQWZDWHUIURPEHLQJIHGEDFNWKURXJKWKHGXFWV¿J
Most of the removed material is expelled out
Z
ards
therefore make sure that it does not hit an
\
person or ob
M
ect
Z
hen it falls out.
In order to avoid as much as possible outer plaster breaking
it is necessar
\
to proceed carefull
\
Z
ith the last part of hole execution
decreasing pressure on core borers.
Next
drill the holes for anchoring the fastening brackets to the
Z
all using as a
¿
rst option the 4 holes on the ends of the bracket
as sho
Z
n on the drilling template.
If the
Z
all is not ver
\
solid
it is advisable to use some extra anchor bolts.
As
\
ou can see
the bracket can be fastened in a number of different
Z
a
\
s and positions. The ma
M
orit
\
of the
Z
eight of the appliance
is to the right side so ensure that
¿
xing is more secure on this side.The anchor bolts provided require holes
Z
ith a diameter of 10 mm.
In an
\
case
the
Z
all should be inspected carefull
\
to determine the best possible anchorage and t
\
pe of bolts suitable for parti-
cular situations.
WARNING
: the manufacturer
Z
ill not be held liable for an
\
underestimates made in the structural consistenc
\
of the anchor pre-
pared b
\
the installer.
Therefore
pa
\
utmost attention to the foregoing operation that could cause serious in
M
ur
\
/damage to people/propert
\
if carried
out incorrectl
\
.
When installing models equipped
Z
ith heating pump
if no condensate discharge
Z
as built into the
Z
all (see paragraph 2.3.2)
in
order to drain the condensate it
Z
ill be necessar
\
to drill a hole through the
Z
all in the position sho
Z
n on the template.
2.3.3
Preparing the condensate discharge
As far as machines equipped
Z
ith a heating pump are concerned
connect the unit to the condensate discharge pipe (supplied) b
\
coupling it
Z
ith the speci
¿
c vent (
¿
g. 6 ref. A) that is on the back of the machine (remove cap B). When the max level is reached
a solenoid valve ensures the condensate
Z
ill
À
o
Z
out from the internal tra
\
. For cold-onl
\
machines
connect the condensate
discharge pipe if
\
ou intend running the unit at lo
Z
outdoor temperatures (lo
Z
er than 23°C).
Since condensate drains b
\
gravit
\
there must be a minimum slope of at least 3
at ever
\
point of the discharge line. Use a rigid
or
À
exible tube having an inside diameter of at least 16 mm.
If the line empties into a se
Z
erage s
\
stem
install a siphon before the point in
Z
hich the pipe reaches the main discharge
at least
300 mm belo
Z
the inlet from the unit (
¿
g. 6).
If the drainpipe drains into a vessel (tank or other container)
this container
should not be sealed and the drainpipe should not
remain immersed in the water
(see
¿
g. 7).
The hole through
Z
hich the condensate pipe passes should al
Z
a
\
s slope to
Z
ards the outside (see
¿
g. 8).
The exact position in
Z
hich to place the pipe inlet
as compared to the machine
is sho
Z
n on the drilling template.
CAUTION: make sure, in this case, that the water expelled outward does not damage or disturb persons or property.
During the winter this type of drainage may cause sheets of ice to form.
When the condensate drainage is
¿
tted
pa
\
much attention not to compress the rubber hose.
2.3.4
Assembly of the air ducts and external grids
After having drilled the holes
insert the plastic sheet supplied
Z
ith the conditioner into them.
The length of the sheets must be 65 mm less than the thickness of the wall.
Roll the sheet and insert it into the hole (
¿
g. 9)
SD\LQJDWWHQWLRQWRWKHVSOLFLQJOLQH¿JUHI$ZKLFKPXVWDOZD\VIDFH
upwards.
Use an ordinar
\
cutter for the foregoing operation (
¿
g. 9).
To position the external grids
proceed as follo
Z
s:
- Appl
\
the seal (
¿
g. 10 ref. B) to the
Z
all
À
ange (
¿
g. 10 ref. A)
ensuring it lines up
Z
ith the outer edge of the
À
ange as indicated
in the
¿
gure.
-
Fix the t
Z
o
À
anges using 2 pegs having a diameter of 6 and check that the t
Z
o
¿
xing holes are horizontal.
-
Fit the small e
\
elet of the spring
Z
ith the long stem
on the cap pin (on both components) (
¿
g. 11).
- Insert the t
Z
o caps (
Z
ith spring)
on the front part of the external grid
on its t
Z
o housings
pulling until it clicks (
¿
g. 12) and
2
Содержание UNICO AIR INVERTER 8 HP
Страница 1: ...IR INVERTER...
Страница 2: ...2 1 A B C D E F G H 2 4 6 5 7 3 4 3 2 1...
Страница 3: ...3 UNICO AIR 5 B A 6 7 8 A 9...
Страница 4: ...4 15 10 11 13 14 12 A B...
Страница 5: ...5 UNICO AIR 16 17 18 A C B...
Страница 6: ...6 21 20 19 H G LED D LED C LED B LED A...
Страница 7: ...7 UNICO AIR 22 23 B A...
Страница 24: ...3...
Страница 40: ...3...
Страница 56: ...3...
Страница 72: ...3...
Страница 88: ...www olimpiasplendid it info olimpiasplendid it 278475B...