Olimpia electronics SLD-28/SP Скачать руководство пользователя страница 1

Page

 

1 from

 3

 

Thank you for purchasing this product of

Battery charging

 

Olympia

 

Electronics. A European manufacturer.

The  battery  charging  is  completely  controled

In 

this  case,  is

 

achieved  the  perfect    battery 

 

GENERAL

maintenance 

as  well  as  the  elongation  of  its 

The  luminaire  consists  mainly  from  two  parts, 

duration

When  the  battery  has  completely 

the body, where all the electronics are located 

charged

it charges with a maintenance current.

and  the  lamp-head  where  the  indication  sign 
and the high efficiency LEDs are located.

  Manual

 Test

The manual test can be conducted only if the 

Maintained to non-maintained selection 

main power supply and the battery is 

capability

connected. By pressing the test button briefly 

Power  on  the  device  and  press  continuously 

an operation test is initiated. During this test 

the  TEST  button  for  10  seconds,  until  the  led 

period all indication LEDs are OFF.

strip  turns  off.  Release  the  button  and  after  a 
short  emergency  test,  the  device  operates  as 

Automatic test

non-maintained.  If  you  want  to  restore  the 

This  test  includes  all  the  operations  that 

previous  condition  (maintained  operation), 

provide  the  manual  test  and  is  conducted 

press  continuously  the  TEST  button  for  10 

automatically  every  15  days.  In  order  to  be 

seconds,  until  the  led  strip  lights.  Release  the 

performed,  the  main  power  supply  and  the 

button  and  after  a  short  emergency  test,  the 

battery should be connected 

device  operates  as  maintained  illumination 
sign.

Automatic Autonomous Test

The Automatic autonomous Test is conducted 

Installation

and measures the luminaire`s back up 

To  install  the  illumination  sign  follow  the 

operation. This test is conducted automatically 

installation instructions on page 2.

every six months

In order to be performed, the 

main power supply and the battery should be 

Battery Cut-off

connected (the battery should be charged)

If 

The luminaire enters in this operation when the 

the battery is not charged

the test is 

mains  power  supply  fails

 

and  battery  has  lost 

postponed

 

until the battery is  completely 

its  energy

During  this  operation  the  luminaire 

charged. If during the Automatic Autonomous 

enters  the  idle  state

 

and  battery  consumption 

Test the luminaire’s duration is lower than the 

is negligible, in order to be protected from deep 

named, then the battery must be replaced. 

discharge.

SELF TESTING MAINTAINED ILLUMINATION SIGNS WITH WHITE LED’s

 SLD-34/SP

SLD-44/SP

 SLD-28/SP

220-240V AC/50-60Hz

3h

24h

Overcharging and full discharging protection

Charge LED, Lamp LED, Fault LED

IP 30

3.6V/1.5Ah

85lm /85lm 

105lm /105lm 

9.5 VA

9 VA

EN 60598-1, EN 60598-2-22

, ΕΝ 55015, ΕΝ 61547, ΕΝ 61000-3-2, ΕΝ 61000-3-3, 

EN 1838

 

40  C

o

to

up to 95% 

Bayblend FR3010

aluminum

plexiglas

280x120x15mm

3 years

 (1 

year for the battery

)

790gr.

1110gr.

1580gr.

340x190x15mm

440x240x15mm

289x65x34mm

TECHNICAL CHARACTERISTICS

Operation  temperature range

Relative humidity
Construction materials
External panel's dimensions
External unit’s dimensions
Typical weight
Guarantee

Mains voltage

Maximum power consumption
Battery (Ni-MH)

Recharging  time

Battery protection
Indications

Minimum emergency duration

Degrees of cover protection
Produced in accordance with 

Light source intensity (230V) / (emerg.)

High Quality European based Manufacturers

922044006_09_0

20

Отзывы: