background image

OLEO INTERNATIONAL

Grovelands
Longford Road
Exhall
Coventry
United Kingdom
CV7 9NE 

E

 [email protected]

T

  +44 (0)24 7664 5555  

F

  +44 (0)24 7664 5900

W

 oleo.co.uk

OLEO BUFFERS SHANGHAI 
COMPANY LTD

Plant A15 Xinfei Garden
No.3802 Shengang Road
Songjiang
Shanghai
201612 China

E

 [email protected]

T

  +86 21 6776 0688 

F

  +86 21 6776 0689

W

 oleo.cn

Oleo International is a division of T.A. Savery and Co Limited, whose ultimate parent is Brigam Limited. T.A. Savery and 
Co Limited is a company incorporated in England and Wales under company number 00272170 and whose registered 
office is at Grovelands, Longford Road, Exhall, Coventry, CV7 9NE, UK.

RUSSIA

KOREA

CHINA

GB7588

ASME

CANADA/USA

0086

EUROPE

This Installation Guide can be found in the following languages;

Please visit:

https://www.oleo.co.uk/downloads/elevator-installation-booklets

Français

Deutsche

Español

Porigiese

Brasileiro

Italiano

Pусский

한국어

French

German

Spanish

Portuguese

Brazilian

Italian

Russian

Korean

中文

日本語

Chinese

Japanese

ALTERNATIVE LANGUAGE INSTALLATION INSTRUCTIONS

9-35703-1 Issue 2  July 2018

Содержание MLB 13

Страница 1: ...INSTALLATION GUIDE ENGLISH MLB SERIES INSTALLATION GUIDE ELEVATOR BUFFERS MLB 13 32...

Страница 2: ...itable for wet corrosive conditions The Oleo MLB elevator buffer is supplied containing compressed gas the plunger is held in the fully compressed condition during transportation by means of a bolt th...

Страница 3: ...our regional health and safety laws are adhered to DO NOT lift buffer with the striker shown in Figure 1 Avoid contact as this may cause damage Always confirm the weight of the buffer to be lifted and...

Страница 4: ...11 15 24 58 12 39 27 32 MLB 18 12 67 27 93 14 01 30 89 MLB 20 15 02 33 11 16 94 37 34 MLB 25 21 05 46 41 23 97 52 85 MLB 32 29 72 65 52 34 29 75 59 Kg Lbs Kg Lbs MLB 13 32 Range Buffer Model Without O...

Страница 5: ...state now the buffer can be released by removing the transportation bolt The following is the recommended removal procedure For a controlled release lower the elevator car or equivalent onto the buffe...

Страница 6: ...orage the plunger may require assistance to initially extend This should be done using rubber dead blow mallet to tap the underside of the buffer top plate GREEN in Figure 3 at 90 degree intervals unt...

Страница 7: ...N MINIMUM MAXIMUM Take care when handling the oils Observe the oil manufacturers recommendations The oil level needs to be between the Minimum and Maximum marks indicated on the dipstick as shown in F...

Страница 8: ...3 Gradually fill the buffer with oil until the oil level is visible between the minimum and maximum levels on the dipstick indicated on Figure 4 4 Allow the buffer to stand for a minimum of 30 minutes...

Страница 9: ...e dipstick and inspect level The oil level needs to be between the maximum and minimum marks indicated on the dipstick as shown in Figure 4 5 Once oil level is correct replace dipstick and securely fa...

Страница 10: ...ally impact the buffer at the full rated speed of the elevator 7 Complete final checks of oil level and the buffer is at correct working height Oleo recommends the final 7 step process is followed pri...

Страница 11: ...d switch 2 Check the oil level is correct 3 Compress the buffer across its full working stroke 4 After the compression ensure the buffer has returned to its correct working height and visually check f...

Страница 12: ...s Brigam Limited T A Savery and Co Limited is a company incorporated in England and Wales under company number 00272170 and whose registered office is at Grovelands Longford Road Exhall Coventry CV7 9...

Отзывы: