6
4.2 Back View
z
PWR
-
Power LED will light up after the IP Camera completed the boot process
z
Power Connector -
For connection of 12V DC input
z
Reset -
When the device is empowered, press the Reset Button to reboot the device, or hold the
Reset Button for 10 seconds to set the device settings back to factory default
z
Network Connector -
For connection to the Ethernet via RJ-45 standard with PoE
z
Network Indicator (Green Light) -
Green light will light up after the IP Camera connected
with network and IP Camera completed the boot process.
z
Network Transmit Indicator (Yellow Light) –
Yellow light will light up when the data is
transmitting via internet.