background image

Architecture Flow

Description

work zone information

Summary of maintenance and construction work zone activities affecting the 
road network including the nature of the maintenance or construction activity, 
location, impact to the roadway, expected time(s) and duration of impact, 
anticipated delays, alternate routes, and suggested speed limits.  This 
information may be augmented with images that provide a visual indication of 
current work zone status and traffic impacts.

work zone status

Current work zone status including current location (and future locations for 
moving work zones), impact to the roadway, required lane shifts, expected 
time(s) and duration of impact, anticipated delays, alternate routes, and 
suggested speed limits.

work zone warning notification

Notification of a work zone emergency or safety issue.  This flow identifies that 
a work zone emergency or safety issue has occurred so that warnings may be 
generated by more than one system in the work zone.

work zone warning status

Status of a work zone safety monitoring and warning devices.  This flow 
documents system activations and includes additional supporting information 
(e.g., an image) that allows verification of the alarm.

Page 11 of 11

Architecture Flow Descriptions

OKI ITS

Содержание Vehicle Alarm

Страница 1: ...erts and advisories_ud Assessments general incident and vulnerability awareness information advisories identification of threats or recommendations to increase preparedness levels and alerts informati...

Страница 2: ...flow contains inquiries to the commercial vehicle managing system CVO pass pull in message This flow represents the visual or auditory interface with ITS equipment containing a message sent to commerc...

Страница 3: ...sources to be deployed to support emergency response and or evacuation emergency traveler information Public notification of an emergency such as a natural or man made disaster civil emergency or chil...

Страница 4: ...Request for information about a particular hazmat load hazmat spill notification_ud hri advisories Notification of Highway Rail Intersection equipment failure intersection blockage or other condition...

Страница 5: ...Coordination and exchange of transportation information between centers This flow allows a broad range of transportation information collected by one ISP to be redistributed to many other ISPs and th...

Страница 6: ...Information that enables parking management activities to be coordinated between different parking operators or systems in a region parking demand management request Request to change the demand for p...

Страница 7: ...Aggregated route usage travel times and other aggregated data collected from probe vehicles that can be used to estimate current traffic conditions road network traffic probe data_ud Aggregated route...

Страница 8: ...information about the equipment and or materials available at a maintenance storage facility suggested route Suggested route for a dispatched emergency or maintenance vehicle that may reflect current...

Страница 9: ...notification of transit emergency at a transit stop or on transit vehicles and further coordination as additional details become available and the response is coordinated transit fare and passenger st...

Страница 10: ...ment capabilities personal preferences and recurring trip characteristics traveler request Request by a traveler to summon assistance request information make a reservation or initiate any other trave...

Страница 11: ...current location and future locations for moving work zones impact to the roadway required lane shifts expected time s and duration of impact anticipated delays alternate routes and suggested speed li...