
2 Installation
2.1 Installing cooling unit
Place the cooling unit as high as possible. Cold air flows downwards.
If you bring the pipes to the unit through a wall behind the unit, create a passthrough
for the pipes. The dimensions required for locating the pass through are indicated on
the cooling unit mounting plate.
Installation site requirements
● There are no obstructions 1000 mm in front of or next to the air outlet.
Pos.
Distance
X
>1000 mm
Y
>1000 mm
● There are no heat sources or devices that generate water vapor near the unit.
● The location is optimal for air circulation within the room.
● A condensate drain can be installed conveniently.
● The unit is not next to a doorway.
● The installation height is correct.
Making a mounting box for the cooling unit
A service hatch will be mounted inside the mounting box, at the edge of
the box.
The cooling unit requires a mounting box for installation. This box must be insulated,
as it extends into the cool intermediate floor structure. Make the mounting box from
laminated timber or similar material.
● When making the box, leave room for a service hatch (width: around 200 mm) next
to the cooling unit for making connections and bleeding pipes.
Minimum mounting box width and length:
● Ck5: 850 mm
● Ck9: 1150 mm
6 (20)
M8015 2337EN
Содержание OilonCooling Ck5
Страница 2: ......
Страница 4: ...2 20 M8015 2337EN ...
Страница 11: ...Two pipe system Power supply for valve actuator Protective earth M8015 2337EN 9 20 ...
Страница 23: ......
Страница 25: ......
Страница 26: ......
Страница 27: ......
Страница 28: ......
Страница 29: ......