EN-6 MB120
generate magnetic fields.
• On an unlevel work surface.
• In confined areas, allow sufficient
space around the instrument for ease
of operation and keep away from
radiating heat sources.
3.3 Installing the Tray Pan, Draft Shield and Pan Support
Lift the cover straight up and Install the tray
pan in the base of the heating chamber.
Install the draft shield (only one position
possible) on top of the tray pan.
Install the pan support into position. Turn the
pan support until it engages. In the locked
position, the arm of the pan support points
directly towards the front of the analyzer.
3.4 Leveling the Moisture Analyzer
Exact horizontal positioning and stable installation are prerequisites for repeatable results.
To compensate for small irregularities or inclinations at the location, the instrument can be
leveled.
Adjust the leveling feet of the Moisture
Analyzer until the air bubble in the
indicator is centered. The level indicator is
located under the cover towards the rear of
the Moisture Analyzer.
Attention: The instrument should be
leveled each time its location is changed.
For more information about leveling, check
section 6.6.2 for details.
Leveling
Indicator
Leveling
Feet
Содержание MB120
Страница 1: ...Instruction Manual MB120 Moisture Analyzer...
Страница 2: ......
Страница 74: ......
Страница 75: ......