
INSTRUCTIONS
WORK SURFACE INSTALLATION
LOW HEIGHT CABINET
WORK SURFACE
HEIGHT CABINET
LOW HEIGHT CABINET
Place back panel against cabinets so vein lined edge is
•
against end panels. (Figure A)
Use pry bar to lift back panel until it contacts work surface
•
and is flush to the bottom of the end panels.
When back panel is in place, secure by screwing #8 x 1/14" pan
•
head screws (HK-15) through pre-drilled holes in case spacers
fig. A
Pre-drilled holes
Pre-drilled holes
Pre-drilled holes
1.25
1.25
VEIN
LINE
BACK PANEL INSTALLATION
Cabinets can be built either upright or upside-down.
•
Remove drawers and adjustable shelves from pedestals.
•
Lower fold-down backs in open pedestals.
•
Cabinets can be pilot bored and screwed together using
•
#8 x 1 1/4" pan head screws. (Note that this will deface
the outside of these cabinets).
Place work surface on cabinets with 1.25" overhang to front
•
and back of SIDE PANEL.
Attach work surface by screwing #8 x 1 1/4" pan head screws (HK-15)
•
through pre-drilled holes in case spacers or top panels.
WORK SURFACE
HEIGHT CABINET
PRY BAR
Rev:
Dwg: 2561INS
INSTRUCTIONS
WORK SURFACE INSTALLATION
LOW HEIGHT CABINET
WORK SURFACE
HEIGHT CABINET
LOW HEIGHT CABINET
Place back panel against cabinets so vein lined edge is
•
against end panels. (Figure A)
Use pry bar to lift back panel until it contacts work surface
•
and is flush to the bottom of the end panels.
When back panel is in place, secure by screwing #8 x 1/14" pan
•
head screws (HK-15) through pre-drilled holes in case spacers
fig. A
Pre-drilled holes
Pre-drilled holes
Pre-drilled holes
1.25
1.25
VEIN
LINE
BACK PANEL INSTALLATION
Cabinets can be built either upright or upside-down.
•
Remove drawers and adjustable shelves from pedestals.
•
Lower fold-down backs in open pedestals.
•
Cabinets can be pilot bored and screwed together using
•
#8 x 1 1/4" pan head screws. (Note that this will deface
the outside of these cabinets).
Place work surface on cabinets with 1.25" overhang to front
•
and back of SIDE PANEL.
Attach work surface by screwing #8 x 1 1/4" pan head screws (HK-15)
•
through pre-drilled holes in case spacers or top panels.
WORK SURFACE
HEIGHT CABINET
PRY BAR
Rev:
Dwg: 2561INS
INSTRUCTIONS
WORK SURFACE INSTALLATION
LOW HEIGHT CABINET
WORK SURFACE
HEIGHT CABINET
LOW HEIGHT CABINET
Place back panel against cabinets so vein lined edge is
•
against end panels. (Figure A)
Use pry bar to lift back panel until it contacts work surface
•
and is flush to the bottom of the end panels.
When back panel is in place, secure by screwing #8 x 1/14" pan
•
head screws (HK-15) through pre-drilled holes in case spacers
fig. A
Pre-drilled holes
Pre-drilled holes
Pre-drilled holes
1.25
1.25
VEIN
LINE
BACK PANEL INSTALLATION
Cabinets can be built either upright or upside-down.
•
Remove drawers and adjustable shelves from pedestals.
•
Lower fold-down backs in open pedestals.
•
Cabinets can be pilot bored and screwed together using
•
#8 x 1 1/4" pan head screws. (Note that this will deface
the outside of these cabinets).
Place work surface on cabinets with 1.25" overhang to front
•
and back of SIDE PANEL.
Attach work surface by screwing #8 x 1 1/4" pan head screws (HK-15)
•
through pre-drilled holes in case spacers or top panels.
WORK SURFACE
HEIGHT CABINET
PRY BAR
Rev:
Dwg: 2561INS
INSTRUCTIONS
WORK SURFACE INSTALLATION
LOW HEIGHT CABINET
WORK SURFACE
HEIGHT CABINET
LOW HEIGHT CABINET
Place back panel against cabinets so vein lined edge is
•
against end panels. (Figure A)
Use pry bar to lift back panel until it contacts work surface
•
and is flush to the bottom of the end panels.
When back panel is in place, secure by screwing #8 x 1/14" pan
•
head screws (HK-15) through pre-drilled holes in case spacers
fig. A
Pre-drilled holes
Pre-drilled holes
Pre-drilled holes
1.25
1.25
VEIN
LINE
BACK PANEL INSTALLATION
Cabinets can be built either upright or upside-down.
•
Remove drawers and adjustable shelves from pedestals.
•
Lower fold-down backs in open pedestals.
•
Cabinets can be pilot bored and screwed together using
•
#8 x 1 1/4" pan head screws. (Note that this will deface
the outside of these cabinets).
Place work surface on cabinets with 1.25" overhang to front
•
and back of SIDE PANEL.
Attach work surface by screwing #8 x 1 1/4" pan head screws (HK-15)
•
through pre-drilled holes in case spacers or top panels.
WORK SURFACE
HEIGHT CABINET
PRY BAR
Rev:
Dwg: 2561INS
INSTRUCTIONS
WORK SURFACE INSTALLATION
LOW HEIGHT CABINET
WORK SURFACE
HEIGHT CABINET
LOW HEIGHT CABINET
Place back panel against cabinets so vein lined edge is
•
against end panels. (Figure A)
Use pry bar to lift back panel until it contacts work surface
•
and is flush to the bottom of the end panels.
When back panel is in place, secure by screwing #8 x 1/14" pan
•
head screws (HK-15) through pre-drilled holes in case spacers
fig. A
Pre-drilled holes
Pre-drilled holes
Pre-drilled holes
1.25
1.25
VEIN
LINE
BACK PANEL INSTALLATION
Cabinets can be built either upright or upside-down.
•
Remove drawers and adjustable shelves from pedestals.
•
Lower fold-down backs in open pedestals.
•
Cabinets can be pilot bored and screwed together using
•
#8 x 1 1/4" pan head screws. (Note that this will deface
the outside of these cabinets).
Place work surface on cabinets with 1.25" overhang to front
•
and back of SIDE PANEL.
Attach work surface by screwing #8 x 1 1/4" pan head screws (HK-15)
•
through pre-drilled holes in case spacers or top panels.
WORK SURFACE
HEIGHT CABINET
PRY BAR
Rev:
Dwg: 2561INS
1. Cabinets can be built either upright or upside down.
2. Remove drawers and adjustable shelves from pedestals.
3. Lower fold-down backs in open pedestals.
4. Cabinets can be pilot bored and screwed together using #8 x 11/4" pan head screws.
(Note that this will deface the outside of these cabinets).
5. Place worksurface on cabinets with 1.25" overhang to front and back of SIDE PANEL.
6. Attach worksurface by screwing #8 x 11/4" pan head screws (HK-15) through pre-drilled
holes in case spacers or top panels.
1. Place back panel against cabinets so vein lined edge is against end panels. (Figure A)
2. Use a pry bar to lift back panel until it contacts the worksurface and is flush to the
bottom of the end panels.
3. When back panel is in place, secure by screwing #8 x 11/4" pan head screws (HK-15)
through pre-drilled holes in case spacers.
MODULAR PEDESTALS
ASSEMBLY INSTRUCTIONS
APTOS
Pre-drilled holes
(Reference #6)
Worksurface Installation
Back Panel Installation
WORKSURFACE HEIGHT CABINET
INSTRUCTIONS
WORK SURFACE INSTALLATION
LOW HEIGHT CABINET
WORK SURFACE
HEIGHT CABINET
LOW HEIGHT CABINET
Place back panel against cabinets so vein lined edge is
•
against end panels. (Figure A)
Use pry bar to lift back panel until it contacts work surface
•
and is flush to the bottom of the end panels.
When back panel is in place, secure by screwing #8 x 1/14" pan
•
head screws (HK-15) through pre-drilled holes in case spacers
fig. A
Pre-drilled holes
Pre-drilled holes
Pre-drilled holes
1.25
1.25
VEIN
LINE
BACK PANEL INSTALLATION
Cabinets can be built either upright or upside-down.
•
Remove drawers and adjustable shelves from pedestals.
•
Lower fold-down backs in open pedestals.
•
Cabinets can be pilot bored and screwed together using
•
#8 x 1 1/4" pan head screws. (Note that this will deface
the outside of these cabinets).
Place work surface on cabinets with 1.25" overhang to front
•
and back of SIDE PANEL.
Attach work surface by screwing #8 x 1 1/4" pan head screws (HK-15)
•
through pre-drilled holes in case spacers or top panels.
WORK SURFACE
HEIGHT CABINET
PRY BAR
Rev:
Dwg: 2561INS
Pre-drilled holes
(Reference #3)
WORKSURFACE HEIGHT CABINET
LOW HEIGHT MODULAR CABINET
LOW HEIGHT MODULAR CABINET
Pre-drilled holes
(Reference #6)
Pre-drilled holes
(Reference #3)
(Reference #5)
Figure
A
Vein
Line
PART # 1697863
INSTRUCTION SHEET # 2561INS