Ofs APTOS Скачать руководство пользователя страница 11

INSTRUCTIONS

WORK SURFACE INSTALLATION

LOW HEIGHT CABINET

WORK SURFACE

HEIGHT CABINET

LOW HEIGHT CABINET

Place back panel against cabinets so vein lined edge is

against end panels. (Figure A)

Use pry bar to lift back panel until it contacts work surface

         and is flush to the bottom of the end panels.

When back panel is in place, secure by screwing #8 x 1/14" pan

head screws (HK-15) through pre-drilled holes in case spacers

fig. A

Pre-drilled holes

Pre-drilled holes

Pre-drilled holes

 1.25 

 1.25 

VEIN

LINE

BACK PANEL INSTALLATION

Cabinets can be built either upright or upside-down.

Remove drawers and adjustable shelves from pedestals.

Lower fold-down backs in open pedestals.

Cabinets can be pilot bored and screwed together using

#8 x 1 1/4" pan head screws. (Note that this will deface

the outside of these cabinets).

Place work surface on cabinets with 1.25" overhang to front

and back of SIDE PANEL.

Attach work surface by screwing #8 x 1 1/4" pan head screws (HK-15)

through pre-drilled holes in case spacers or top panels.

WORK SURFACE

HEIGHT CABINET

PRY BAR

Rev:

Dwg: 2561INS

INSTRUCTIONS

WORK SURFACE INSTALLATION

LOW HEIGHT CABINET

WORK SURFACE

HEIGHT CABINET

LOW HEIGHT CABINET

Place back panel against cabinets so vein lined edge is

against end panels. (Figure A)

Use pry bar to lift back panel until it contacts work surface

         and is flush to the bottom of the end panels.

When back panel is in place, secure by screwing #8 x 1/14" pan

head screws (HK-15) through pre-drilled holes in case spacers

fig. A

Pre-drilled holes

Pre-drilled holes

Pre-drilled holes

 1.25 

 1.25 

VEIN

LINE

BACK PANEL INSTALLATION

Cabinets can be built either upright or upside-down.

Remove drawers and adjustable shelves from pedestals.

Lower fold-down backs in open pedestals.

Cabinets can be pilot bored and screwed together using

#8 x 1 1/4" pan head screws. (Note that this will deface

the outside of these cabinets).

Place work surface on cabinets with 1.25" overhang to front

and back of SIDE PANEL.

Attach work surface by screwing #8 x 1 1/4" pan head screws (HK-15)

through pre-drilled holes in case spacers or top panels.

WORK SURFACE

HEIGHT CABINET

PRY BAR

Rev:

Dwg: 2561INS

INSTRUCTIONS

WORK SURFACE INSTALLATION

LOW HEIGHT CABINET

WORK SURFACE

HEIGHT CABINET

LOW HEIGHT CABINET

Place back panel against cabinets so vein lined edge is

against end panels. (Figure A)

Use pry bar to lift back panel until it contacts work surface

         and is flush to the bottom of the end panels.

When back panel is in place, secure by screwing #8 x 1/14" pan

head screws (HK-15) through pre-drilled holes in case spacers

fig. A

Pre-drilled holes

Pre-drilled holes

Pre-drilled holes

 1.25 

 1.25 

VEIN

LINE

BACK PANEL INSTALLATION

Cabinets can be built either upright or upside-down.

Remove drawers and adjustable shelves from pedestals.

Lower fold-down backs in open pedestals.

Cabinets can be pilot bored and screwed together using

#8 x 1 1/4" pan head screws. (Note that this will deface

the outside of these cabinets).

Place work surface on cabinets with 1.25" overhang to front

and back of SIDE PANEL.

Attach work surface by screwing #8 x 1 1/4" pan head screws (HK-15)

through pre-drilled holes in case spacers or top panels.

WORK SURFACE

HEIGHT CABINET

PRY BAR

Rev:

Dwg: 2561INS

INSTRUCTIONS

WORK SURFACE INSTALLATION

LOW HEIGHT CABINET

WORK SURFACE

HEIGHT CABINET

LOW HEIGHT CABINET

Place back panel against cabinets so vein lined edge is

against end panels. (Figure A)

Use pry bar to lift back panel until it contacts work surface

         and is flush to the bottom of the end panels.

When back panel is in place, secure by screwing #8 x 1/14" pan

head screws (HK-15) through pre-drilled holes in case spacers

fig. A

Pre-drilled holes

Pre-drilled holes

Pre-drilled holes

 1.25 

 1.25 

VEIN

LINE

BACK PANEL INSTALLATION

Cabinets can be built either upright or upside-down.

Remove drawers and adjustable shelves from pedestals.

Lower fold-down backs in open pedestals.

Cabinets can be pilot bored and screwed together using

#8 x 1 1/4" pan head screws. (Note that this will deface

the outside of these cabinets).

Place work surface on cabinets with 1.25" overhang to front

and back of SIDE PANEL.

Attach work surface by screwing #8 x 1 1/4" pan head screws (HK-15)

through pre-drilled holes in case spacers or top panels.

WORK SURFACE

HEIGHT CABINET

PRY BAR

Rev:

Dwg: 2561INS

INSTRUCTIONS

WORK SURFACE INSTALLATION

LOW HEIGHT CABINET

WORK SURFACE

HEIGHT CABINET

LOW HEIGHT CABINET

Place back panel against cabinets so vein lined edge is

against end panels. (Figure A)

Use pry bar to lift back panel until it contacts work surface

         and is flush to the bottom of the end panels.

When back panel is in place, secure by screwing #8 x 1/14" pan

head screws (HK-15) through pre-drilled holes in case spacers

fig. A

Pre-drilled holes

Pre-drilled holes

Pre-drilled holes

 1.25 

 1.25 

VEIN

LINE

BACK PANEL INSTALLATION

Cabinets can be built either upright or upside-down.

Remove drawers and adjustable shelves from pedestals.

Lower fold-down backs in open pedestals.

Cabinets can be pilot bored and screwed together using

#8 x 1 1/4" pan head screws. (Note that this will deface

the outside of these cabinets).

Place work surface on cabinets with 1.25" overhang to front

and back of SIDE PANEL.

Attach work surface by screwing #8 x 1 1/4" pan head screws (HK-15)

through pre-drilled holes in case spacers or top panels.

WORK SURFACE

HEIGHT CABINET

PRY BAR

Rev:

Dwg: 2561INS

1.  Cabinets can be built either upright or upside down.

2.  Remove drawers and adjustable shelves from pedestals.

3.  Lower fold-down backs in open pedestals.

4.  Cabinets can be pilot bored and screwed together using #8 x 11/4" pan head screws. 

(Note that this will deface the outside of these cabinets).

5.  Place worksurface on cabinets with 1.25" overhang to front and back of SIDE PANEL.

6.  Attach worksurface by screwing #8 x 11/4" pan head screws (HK-15) through pre-drilled 

holes in case spacers or top panels.

1.  Place back panel against cabinets so vein lined edge is against end panels. (Figure A)

2.  Use a pry bar to lift back panel until it contacts the worksurface and is flush to the 

bottom of the end panels.

3.  When back panel is in place, secure by screwing #8 x 11/4" pan head screws (HK-15) 

through pre-drilled holes in case spacers.

MODULAR PEDESTALS  

ASSEMBLY INSTRUCTIONS

APTOS

Pre-drilled holes 

(Reference #6)

Worksurface Installation

Back Panel Installation

WORKSURFACE HEIGHT CABINET

INSTRUCTIONS

WORK SURFACE INSTALLATION

LOW HEIGHT CABINET

WORK SURFACE

HEIGHT CABINET

LOW HEIGHT CABINET

Place back panel against cabinets so vein lined edge is

against end panels. (Figure A)

Use pry bar to lift back panel until it contacts work surface

         and is flush to the bottom of the end panels.

When back panel is in place, secure by screwing #8 x 1/14" pan

head screws (HK-15) through pre-drilled holes in case spacers

fig. A

Pre-drilled holes

Pre-drilled holes

Pre-drilled holes

 1.25 

 1.25 

VEIN

LINE

BACK PANEL INSTALLATION

Cabinets can be built either upright or upside-down.

Remove drawers and adjustable shelves from pedestals.

Lower fold-down backs in open pedestals.

Cabinets can be pilot bored and screwed together using

#8 x 1 1/4" pan head screws. (Note that this will deface

the outside of these cabinets).

Place work surface on cabinets with 1.25" overhang to front

and back of SIDE PANEL.

Attach work surface by screwing #8 x 1 1/4" pan head screws (HK-15)

through pre-drilled holes in case spacers or top panels.

WORK SURFACE

HEIGHT CABINET

PRY BAR

Rev:

Dwg: 2561INS

Pre-drilled holes 

(Reference #3)

WORKSURFACE HEIGHT CABINET

LOW HEIGHT MODULAR CABINET

LOW HEIGHT MODULAR CABINET

Pre-drilled holes 

(Reference #6)

Pre-drilled holes 

(Reference #3)

(Reference #5)

Figure 

A

Vein 

Line

PART # 1697863

INSTRUCTION SHEET # 2561INS

Содержание APTOS

Страница 1: ...he mounting plates back edge see illustration below and mark location of each hole using mount plate holes as location guide 3 After marking mounting plate hole locations remove duofoil legs and pre bore 1 8 diameter x 13 16 deep holes at previously marked locations 4 Attach duofoil legs to bottom side of top wire cavity facing kneespace with HK 71 aligning holes in mount plate with pre bored hole...

Страница 2: ...trifoil column in desired location centered in top depth and no more than 18 from end of top to center of column and mark location using mounting plate holes as location guide 3 After marking mounting plate hole locations remove trifoil column and pre bore 1 8 diameter x 13 16 deep holes at previously marked locations 4 Attach trifoil column to bottom side of top with HK 98 aligning holes in mount...

Страница 3: ...ng holes in the top of the low height cabinet in the next step Center line of top XX PART 1699910 INSTRUCTION SHEET 2567INS ELEVATED RUNOFF TOP INSTALLATION INSTRUCTIONS APTOS CENTER LINE OF TOP XX 3 The Duofoil pieces will be rotated at a 45 angle 4 Measure the center to center distance of the mounting studs on the Duofoil standoffs 5 This measurement will be used to bore the mounting holes in th...

Страница 4: ...d runoff top is placed secure it with the washer and nut supplied with the standoffs Level top with the adjustable leveler in the runoff end support Determine application open plan or private office open plan is located 3 5 off front edge of cabinet private office is located 9 off the back edge of the cabinet Locate desired placement side to side on the low height cabinet and mark the center line ...

Страница 5: ...RD THE KNEESPACE ALIGN HOLES IN THE MOUNT PLATE WITH THE PRE BORED HOLES IN THE TOP ATTACH USING HK 31 STEP 3 REPEAT STEPS 1 2 FOR REMAINING STAND OFFS Dwg Rev 2556INS INSTRUCTIONS TAPE MEASURE DRILL WIRE CAVITY MOUNTING LOCATIONS FOR MODULAR TOPS BEING USED IN AN ELEVATED APPLICATION 2 FOR 24 D TOPS 1 FOR 18 D TOPS 4 875 BOTTOM SIDE ANGLE TO THE EDGE FOR LOCATIONS DUOFOIL STANDOFFS OF THE TOP WIT...

Страница 6: ...TO SIDE INSET 1 8 FROM OUTER END OF TOP ATTACH WITH HK 98 Rev Dwg 2549INS PART 1697663 INSTRUCTION SHEET 2549INS END PANEL ASSEMBLY INSTRUCTIONS APTOS 1 With top upside down on a protective surface place end panel assembly on top as shown centered side to side 2 Inset 1 8 from outer end of top and attach with HK 98 HK 98 8 12 x 1 Screws BOTTOM OF TOP ...

Страница 7: ...rt into control box and plug into a power source 5 Press the down arrow button on the control switch to syncronize the lift columns Press the up arrow on the control switch to raise the base approx 10 allowing access to the mounting plates 6 Attach the base to the top using HK 71 through the mounting plates aligning with the pre bored holes in the top 7 Use the remaining screws from HK 83 along wi...

Страница 8: ...OR STABILITY INSTRUCTIONS ATTACHING HEIGHT ADJUSTABLE CREDENZA TO ADJOINING CABINET WARNING Height adjustable credenza will not stand on it s own Stabalize cabinet at all times until secured to adjoining cabinets for panel removal NOTE Must have a cabinet or end panel minimum 18 D attached on each side for stability Machined finger grips Remove lower face panel of height adjustable credenza pullin...

Страница 9: ...HE LOWER FRONT OF THE LIFT COLUMN CAVITY IS REMOVABLE BY PULLING PANEL AWAY FROM THE CABINET Rev Dwg PART 1711255 INSTRUCTION SHEET 2552INS HEIGHT ADJUSTABLE PENINSULA DESK INSTALLATION INSTRUCTIONS APTOS REMOVABLE PANEL FINGER GRIP FOR REMOVABLE PANEL NOTE 2 PERSON INSTALL 1 Locate wall cabinet in desired location and level Remove screws from adjustable shelf clips for access to flip down back pa...

Страница 10: ...WER THE TOP BACK TO THE LOWEST POSITION AND LEVEL THE RUNOFF BASE AS NEEDED TO LEVEL THE WORKSURFACE PART 1711255 INSTRUCTION SHEET 2552INS HEIGHT ADJUSTABLE PENINSULA DESK INSTALLATION INSTRUCTIONS APTOS STEP 3 3 With worksurface upside down on a protective surface install the control box with HK 92 4 Attach the control switch with HK 83 Use remaining screws in kit to secure wires at the end of t...

Страница 11: ...NSTALLATION Cabinets can be built either upright or upside down Remove drawers and adjustable shelves from pedestals Lower fold down backs in open pedestals Cabinets can be pilot bored and screwed together using 8 x 1 1 4 pan head screws Note that this will deface the outside of these cabinets Place work surface on cabinets with 1 25 overhang to front and back of SIDE PANEL Attach work surface by ...

Страница 12: ...S PRE BORED AT THE FACTORY MOVE TO STEP 4 Rev Dwg 2548INS PART 1711253 INSTRUCTION SHEET 2548INS SURFACE MOUNT PRIVACY SCREENS ASSEMBLY INSTRUCTIONS APTOS 1 Determine Y dimension center of privacy panel and tape off area to be drilled to protect finished surface 2 Locate template in desired location using centerlines of template and center punch the 2 locating holes on template 3 Remove template a...

Страница 13: ... the bottom edges are on lines and are also positioned so they will line up with the brackets that are mounted onto the back of the panels A small level is included and can be snapped onto the wall bracket to aid with installation BRACKET B Mark the hole locations 7 Drill holes into the wall where marked and fasten the wall brackets Hardware is provided but may not be appropriate for your wall typ...

Страница 14: ... edge of the Stak EM Pak should also be flush to the bottom edge of the top Mark hole locations and pre drill 1 8 diameter x 1 4 deep pilot holes Secure Stak EM Paks with 8 x 5 8 pan head screws HK 7 Peel off one side of backer on two sided tape Apply two sided tape to bottom of cabinet Peel off second backer Position cabinet where desired with back edge flush to the edge of the top and set in pla...

Страница 15: ...of the desk with the top of the mounting brackets flush to the underside of the work surface and attach the brackets to the work surface using 4 8 x 1 pan head wood screws in each bracket 1 Aligning the holes in the brackets with the pre bored holes in the panel attach 3 mounting brackets to the privacy panel using 2 8 x 1 5 pan head wood screws in each bracket 2 Leaving a 1 5 wire management gap ...

Страница 16: ...INE KNEE SPACE SIZE XX D STEP 1 UNPACK AND VERIFY ALL CABINETS CROSS RA STEP 2 DETERMINE FOOT PRINT SIZE A WIDTH X IS FIGURED BY ADDING ALL HEIGHT A AND KNEE SPACES ADD 8 FOR 6 D BASES B DEPTH Y IS DETERMINED BY ADDING ALL WID CABINETS IN THE LONGEST RUN STEP 3 USING THE FOOT PRINT SIZE LOCATE THE CENTER NOTE IF A 6 D END BASE IS WHEN CALCULATING OVE WIDTH THE WORKSURFAC OUTSIDE OF BASE 2 YY XX X ...

Страница 17: ...ROSS RAILS ARE INSTALLED LEVEL AND SQUARE TO AID IN THE REST OF THE ASSEMBLY PROCESS STEP 5 ROTATE MOUNT PLATES ON EACH BASE STEP 6 LEVEL ACROSS MOUNTING PLATES STEP 4 LOCATE SET CABINETS IN PLACE WITH CROSS RAILS STEP 9 PRIVACY SCREENS STEP 4 LOCATE AND SET CABINETS IN PLACE WITH CROSS RAILS STEP 5 ROTATE MOUNT PLATES STEP 6 LEVEL ACROSS MOUNTING PLATES ON EACH BASE STEP 9 PRIVACY SCREENS 4 After...

Страница 18: ... WITH THE CORD CLIPS ONE WRAP TO CLEAN UP AND SECURE WIRES UNDERNEATH THE WORK SURFACE AS DESIRED STEP 10 INSTALL STORAGE CABINETS STEP 13 INSTALLING THE WORKSURFACES STEP 10 INSTALL STORAGE CABINETS STEP 13 INSTALLING THE WORKSURFACES 10 Locate and place shared storage cabinets Align and level with previously installed height adjustable bases 11 Temporarily connect control box to the lift columns...

Отзывы: