Offgridtec PSI-Inverter
Operation Steps
Step 1: Turn the power switch of the inverter to OFF
Step 2: Disconnect the input breaker or the fuse between inverter and battery, connect the battery
terminals (‘+’ with red line and ‘-’ with black line). Do not connect the poles by contraries.
Step 3: Use the cable no less than 4mm2 to connect the grounding terminal of the inverter to the ground.
Step 4: Connect the plug of AC load to the inverter AC outlet
Step 5: Switch on the input breaker or the fuse between inverter and battery; turn on the power switch
to start the inverter. If the green indicator is on solid, turn on the loads one by one. Check the
operation state of the inverter and loads.
Step 6: If there are different types of loads, it is suggested that turn on the loads with higher startup
current first, such as television, then after the loads works stably, turn on the loads with lower
startup current, such as incandescent lamp.
Step 7: If the Fault indicator is red and the buzzer alarms when turn on the devices, please switch off
the loads and inverter immediately.
Note: When use USB port for charging, it is suggested to charge the power bank first, and then use the
power bank to charge mobile phones.
Software
General informations
Offgridtec GmbH
Im Gewerbepark 11
84307 Eggenfelden
WEEE-Reg.-Nr. DE37551136
Kontaktinformation
Tel:
+49 8721 91994-00
Email: [email protected]
Web: www.offgridtec.com
GFR: Christian & Martin Krannich
Konto Sparkasse Rottal-Inn
Konto: 10188985
BLZ: 74351430
IBAN: DE69743514300010188985
BIC: BYLADEM1EGF (Eggenfelden)
Sitz und Amtsgericht
HRB: 9179 Registergericht Landshut
Steuernummer: 141/134/30045
Ust-IdNr: DE287111500
Gerichtsstand: Mühldorf am Inn