13
5.
Remove the Input Sun Gear (6).
6.
Remove Input Carrier Subassembly out of the unit.
7.
Remove Flanged Bolts (11) from Ring Gear thru Hun Spindle subassembly.
8.
Remove the Ring gear (18) off of the Hub-Spindle Subassembly.
9.
CAUTION:
Safety glasses must be worn during these next steps
.
8.
Remove Sun Gear (7) from Output Carrier Subassembly.
9.
Remove External Retaining Ring (26) from the groove on Sun Gear (7).
10.
Remove Bolts (28) and remove the Locking Plate (27) from Internal Coupling (1H).
11.
Lift out the Output Carrier Subassembly from Hub-Spindle Subassembly.
This concludes the Main Disassembly.
Содержание Fairfield Torque-Hub S40B Series
Страница 1: ...1 Torque Hub Planetary Final Drive S40B Series Service Manual Rev 09 03 13 ...
Страница 10: ...10 DISASSEMBLY ...
Страница 11: ...11 THIS PAGE INTENTIONALLY LEFT BLANK ...
Страница 20: ...20 ASSEMBLY ...
Страница 29: ...29 THIS PAGE INTENTIONALLY LEFT BLANK ...
Страница 32: ...32 Planetary Final Drive Service Manual Assembly Drawing ...
Страница 35: ...35 Planetary Final Drive Repair Instructions Assembly Tools T125033 BEARING CUP ASSEMBLY ADAPTOR ...
Страница 36: ...36 T125034 BEARING CUP ASSEMBLY ADAPTOR ...
Страница 37: ...37 T164786 ALIGNMENT PIN FOR ASSEMBLY ...
Страница 38: ...38 T136699 750 DRIVE LOCKNUT WRENCH ...
Страница 39: ...39 T163327 SPLINED LOCATOR RING ...
Страница 40: ...40 T159309 LOADING PLUG AND BASE FOR ASSEMBLY ...
Страница 41: ...41 T160835 ASSEMBLY PRESSING TOOL ...
Страница 42: ...42 T158152 LOADING PLUG AND BASE FOR ASSEMBLY ...
Страница 43: ...43 T158338 ASSEMBLY PRESSING TOOL ...
Страница 44: ...44 T147871 N 12 LOCK NUT WRENCH ...
Страница 45: ...45 T173814 LEAK TEST ADAPTOR ...
Страница 46: ...46 T212150 ROLL TEST TOOL ...
Страница 48: ...48 Oerlikon Fairfield U S 52 South P O Box 7940 Lafayette IN 47903 USA 765 772 4000 www oerlikon com fairfield ...