
8. Determine the desired installation location. This location must conform to the Warnings and Cau-
tion instructions discussed earlier. This Slimline unit must be anchored securely to a wall or ceiling.
The mounting screw locations are designed for standard wood/metal framing with studs on 16 inch
centers. Using the back panel as a template, mark the screw locations onto the mounting surface
so that unit can be screwed directly to the main studs. If there is not sufficient support at the desired
location, support members must be added.
Installer is responsible for the proper installation of this Hydroxyl Generator as per local building and
electrical codes
9. If wiring from back of unit, also mark the 7/8 inch hole onto the mounting surface for the main
electrical connection.
10. Set back panel aside.
11. If wiring from back of unit, cut out hole size as needed for electrical connector, and install electrical
service.
12. Ensure electrical service to this unit is turned off and locked out before continuing. Install electri-
cal connector (not supplied) onto back panel, and make proper electrical connections.
13. Secure back panel to mounting surface using #10, 1 ½ inch wood screws (not supplied) for typical
wood frame construction. If construction type is different, ensure proper support as per construction
type and weight of Hydroxyl Generator.
14. If wiring from the side, install electrical service and make proper electrical connections.
15. Re-install lamp optic following these instructions:
Caution: Use clean leather gloves and eye protection when handling the optics in this unit
• Gently press lamp into the three lamp supports.
• Re-connect lamp connector holding the lamp base with one hand, and lamp connector with
other hand. Note: Lamp connector is keyed. If unable to connect lamp connector with lamp
base, rotate lamp connector 180 degrees and try again.
• Ensure lamp connector and lamp base are firmly pressed together.
8
WALL MOUNT INSTALLATION