background image

ENCLOSED TREATMENT INSTALLATION INSTRUCTIONS

3

7

SECURE

Check top, bottom and sides of
treatment frame to be sure it is
flush to door. Be certain all lock
clips are snug and pushed in fully.

5

HANG

Carefully lift and securely hang the top of the treatment assembly
over the top brackets. Angle the lower unit towards you while you
slide it on. Be certain the brackets are in the slots at the top, inside
edge of the treatment frame. Move side to side to verify the unit is
square and secure.

6

LOCK CLIPS

Press the bottom corners of the treatment assembly
against the door and swing the lock clips in behind the
window frame. They should snap in easily and stay in
place.

PUSH
EMPUJAR
POUSSER

Отзывы: