The  design  and  sizing  of  the  system  must  be 
carried  out  in  accordance  with  the  OCHSNER 
guidelines and standards applicable at the respec-
tive time.  

-

 

The heat pump is sized and tested exclusively 
for operation in public utility electricity supply 
networks.

 

Any  claims  for  possible  malfunctions  or  com-
ponent  damage  arising  from  operation  in  a 
stand-alone  system,  battery  system,  etc.  are 
excluded from the warranty.

 

 

-

 

Warranty  period:

  For  supplied  appliances,  we 

accept  a  warranty  for  a  period  of  2  years  from 
commissioning,  however,  not  more  than  27 
months from delivery  
.  Recourse  claims  pursuant  to  section  933  b 
ABGB  (Austrian  Civil  Code)  are  excluded.  Place 
of  performance  for  all  warranty  claims and claims 
for damages is the Company's registered place of 
business. 

 

-

 

Commissioning:

  The  heat  pump  must  be  com-

missioned  by  the  OCHSNER  customer  service  or 
by  an  authorised  Ochsner  service  partner.  Com-
missioning of the heat pump by the Supplier does 
not lead to any transfer of liability for potential de-
fects in the system. If commissioning is carried out 
under  reservation  or  by  persons  who  have  not 
been  authorised  accordingly  in  writing,  any  war-
ranty claims shall cease to apply. 

 

Warranty conditions (excerpt from the Stand-
ard Terms and Conditions of Supply) 

 

-

 

The Customer shall be obligated to make notifica-
tion in  writing  of any  defects  immediately,  howev-
er,  at  the  most  within  3  days  from  delivery,  and 
prior to any work on, or processing of, the goods, 
including  an  exact  description  of  the  defects,  as 
otherwise  any  warranty  claims  and/or  claims  for 
damages and/or  claims  for  avoidance  on  account 
of  an  error  shall  be  excluded;  however,  such  de-
fects shall not give the Customer the right to with-
hold  the  invoice  sums  or  parts  thereof.  In  the 
event  of  visible  transport  damage,  the  Customer 
shall be obligated to inspect the goods prior to tak-
ing over the transport goods, and to report any  
immediately visible transport damage. 

-

 

For defects which were unable to be found during 
the incoming inspection, the warranty period shall 
be  two  years  from  delivery,  and  shall  neither  be 
extended  nor  suspended  by  improvement  at-
tempts; it shall also apply to partial deliveries.  

 
Such  defects  must  be  notified  in  writing  within  3 
days  from  their  detection,  as  otherwise  any  war-
ranty  claims  and/or  claims  for  damages  and/or 
claims  for  avoidance  on  account  of  an  error  shall 
be excluded; 

-

 

Deviations of the ordered products from the deliv-
ered  products,  such  as  incorrect  dimensions  or 
wrong  product  ("aliud  delivery")  must  be  notified 
within  3  days  from  delivery,  and  prior  to  any  for-
warding  and/or  work  on,  or  processing  of,  the 
goods  Otherwise,  the  object  shall  be  deemed  to 
have  been  approved  and  can  no  longer  be  taken 
back or exchanged by us.  

-

 

Our  consultancy  services,  whether  verbal  or  in 
writing,  are  non-binding  and  will  not  release  our 
Customers  from  the  obligation  of  themselves  ex-
amining  the  contractual  product  with  regard  to  its 
suitability  for  the  intended  purpose.  For  subse-
quent  deliveries,  we  do  not  accept  any  warranty 
with regard to the exact identity with the initial de-
livery.  The  commissioning  of  the  Ochsner  ma-
chines must  always  be carried  out  by  Ochsner  or 
by  a  service  partner  authorised  in  writing  by 
Ochsner.  Commissioning  itself  is  limited  to  the 
components  supplied  by  Ochsner,  but  does  not 
include  the  entire  heating system  or  system com-
ponents  which  were  not  delivered  by  Ochsner. 
The assumption of liability after commissioning for 
the entire heating system or for third-party system 
components is excluded.  

-

 

The  technical  requirements  for  the  design  and 
installation of the system of the products supplied 
by  us  as  set  out  in  manuals,  installation  instruc-
tions  or  similar  documents  only  contain  standard 
minimum requirements, without claiming to be ex-
haustive. The customer is obliged to adhere to the 
current  state-of-the-art  technology  as  well  as  the 
OCHSNER  guidelines,  otherwise  all  warranty 
claims  and  any  guarantees  will  be  invalid.  In  par-
ticular, we shall not assume any warranty or liabil-
ity for the calculations made by the Customer with 
regard  to  the  efficiency  of  the  contractual  object 
provided  by  us  or  with  regard  to  the  suitability  of 
the contractual object provided by us for the appli-
cation purposes intended by the Customer, except 
if this has been agreed separately and in writing.  

-

 

Warranty  for  parts  subject  to  wear  and  tear,  as 
well  as  operating  materials  such  as  filters,  filter 
cartridges,  anodes  as  well  as  electrical  compo-
nents,  circulating  pumps,  E-rod  heaters,  fittings 
and  plate  heat  exchangers  (for  instance  due  to 
chalking,  corrosion,  dry-running,  unsuitable  water 
quality)  is  excluded.  In  case  of  doubt,  proof  of 
compliance with the water qualities in accordance 
with VDI 2035 must be provided by the Customer. 
The corrosion protection anode is to be proved to 
have been serviced. 

 

Содержание OLWI 9

Страница 1: ...BA_OLW I OTE3_SW5x_EN_20160815_V2 1 48 Operating Instructions Installation Instructions OLWI Air Water Heat pump Heating hot water...

Страница 2: ...BA_OLW I OTE3_SW5x_EN_20160815_V2 2 48...

Страница 3: ...ats 16 8 2 2 Insulation 17 8 3 Mounting the cladding 17 8 4 Installing the air hoses 17 8 4 1 General 17 8 4 2 Installing the air hoses 17 8 4 3 Insulating the wall 17 9 Commissioning 18 9 1 Required...

Страница 4: ...ed to the control heat gen erator pumps safety thermostats etc Contact with the terminal strips wires connected to them or non connected wires by persons or by means of elec trically conductive materi...

Страница 5: ...ed between the sea and the place of installation 3 2 Function The heat from the outside air is extracted by means of an air heat exchanger evaporator The refrigerant vaporises and is then compressed b...

Страница 6: ...on can however lead to undesired increase in the sound level under unfavourable circumstances NOTE You can find information on the sound power level in the Technical Data Data Table section 4 2 Air du...

Страница 7: ...liance is accessible from all sides Make sure that the foundation is horizontal level firm and permanent Ensure that the appliance frame fits uniformly on the foundation Uneven ground can influence th...

Страница 8: ...Two screws are provided in the bottom of the heat pump frame one for each side panel Unscrew the 6 fixing screws in the frame and keep them for later use Place the appliance on the prepared foundation...

Страница 9: ...connection Connect the functional module to the heat pump with the pressure hoses supplied 1 Pressure hose flow 2 Pressure hose return Fig 8 Hydraulic connection functional module Check the plug conne...

Страница 10: ...ystems in conjunction with steel pipework can lead to oxygen diffusion corrosion of the steel pipework The products of such corrosion such as rust silting can be deposited on the heat pump condenser a...

Страница 11: ...p must be installed Take the constructional fac tors into consideration When using a condensate pump make sure that its rating is at least 6l min Condensate drain 1 Drain with odour trap 2 Drain hose...

Страница 12: ...e drain After laying the condensate hose make sure that the condensate is draining freely Proceed as follows Pour water onto the evaporator so that it flows into the de icing sump Ensure the maximum c...

Страница 13: ...heat pump All three phase drives compressor pumps fans MUST be connected to a CLOCKWISE field of rotation 7 1 Cable cross sections Position min cross section Connection cable 230V pumps valve motors C...

Страница 14: ...als will be transmitted between the control OTE and the Airstation A 5 pole control cable W5 5x 1 0mm is used for this This is already fitted in the functional module and only has to be connected to t...

Страница 15: ...Ochsner hot water tanks are fitted with corresponding sleeves for the installation The current electromagnetic compatibility guidelines are to be adhered to during laying The sensors are to be checke...

Страница 16: ...tape The tape is in the accessory heat insulated air hose Fig 20 Seal the appliance inside 2 Hang the foil with the pre cut holes on the hooks on the appliance Fig 21 Seal the appliance inside 3 Remo...

Страница 17: ...and air outlet sides Do not make more than four 90 bends The bend ing radius must be at least 600 mm based on the hose middle Use a sharp knife to cut the hose The wire spirals can be cut with wire c...

Страница 18: ...invoiced separate ly 9 2 Non self resetting safety thermostat At outside temperatures below 15 C the non self resetting safety thermostat can trigger the electric emergency auxiliary heater Check whet...

Страница 19: ...y devices for the compressor High pressure pressostat Start delay to avoid compressor chopping Frost protection function Start up and run down times of the fans 10 2 Running costs During the first hea...

Страница 20: ...ied system service intervals as well as the system checks must be adhered to If during larger reconstruction work or after burst pip ing the majority of the water in the heating system has to be drain...

Страница 21: ...t may only be de commissioned by an authorised specialist firm cool ing air conditioning heating The refrigerant resp brine fluid is to be evacuated removed correctly by the specialist firm and and re...

Страница 22: ...lked up Contact heating installer clean and decalcify heat exchanger Hot water temperature not reached or no longer reached Hot water heat exchanger too small Increase heat exchanger size Heat exchang...

Страница 23: ...ce sensor 116 Er 10 Outside sensor defect Replace sensor 117 Er 14 Mixer sensor defect Replace sensor 124 Er 20 TWR sensor defect Replace sensor 120 Er 22 Switch off sensors TWR TPM de fect Replace se...

Страница 24: ...c11 Safety group e22 Hot water Flow External thread G 1 1 4 A e23 Hot water Return External thread G 1 1 4 A E01 Heating flow External thread G 1 1 4 A e02 Heating return External thread G 1 1 4 A g0...

Страница 25: ...BA_OLW I OTE3_SW5x_EN_20160815_V2 25 48 14 2 Hydraulic diagram...

Страница 26: ...BA_OLW I OTE3_SW5x_EN_20160815_V2 26 48 14 3 Electric circuit diagrams OTE...

Страница 27: ...BA_OLW I OTE3_SW5x_EN_20160815_V2 27 48...

Страница 28: ...BA_OLW I OTE3_SW5x_EN_20160815_V2 28 48...

Страница 29: ...BA_OLW I OTE3_SW5x_EN_20160815_V2 29 48 14 4 Wiring overview...

Страница 30: ...or R3 Start up resistance F5 Non self resetting thermostat DAE X1 Terminal strips K1 Start up resistance relay X3 Power supply terminal strip K2 Compressor start up relay X4 Control terminal strip K5...

Страница 31: ...sor suction air PT1000 X33 5 pole plug expansion valve B7 Temperature sensor compressor inlet PT1000 X34 7 pole plug sensors B8 Temperature sensor evaporator outlet PT1000 X35 6 pole plug temperature...

Страница 32: ...9 5 1 3 7 11 15 19 Air tempearture C Power draw kW 6 7 8 9 10 11 12 13 14 15 16 17 21 19 17 15 13 11 9 7 5 3 1 1 3 5 7 9 11 13 15 17 19 21 Heating power kW 35 C 45 C 55 C 60 C Leistungskurven OLWA OL...

Страница 33: ...3 5 7 9 11 13 15 17 19 21 Heating power kW 35 C 45 C 55 C 60 C Leistungskurven OLWA OLWI 18 Air temperature C 0 1 2 3 4 5 6 21 17 13 9 5 1 3 7 11 15 19 Air temperature C COP 14 8 Performance diagram O...

Страница 34: ...Capacity kW 8 9 12 9 16 6 8 9 12 9 16 6 Total Power Consumption kW 2 2 9 5 1 2 2 9 5 1 Coefficient of Perfomance EN 14511 EN 255 4 4 4 4 4 0 4 4 4 4 4 0 Drawn Current A 3 5 6 4 9 9 3 5 6 4 9 9 Heatin...

Страница 35: ...al available external pressure differential hPa 1 0 1 0 1 0 1 0 1 0 1 0 Max available external pressure differential on suction side hPa 0 8 0 8 0 8 0 8 0 8 0 8 Construction Type Fin package material...

Страница 36: ...um portion 2 2 0 3 5 0 4 1 0 5 6 0 6 0 5 7 5 0 8 0 5 9 1 5 10 0 5 11 3 5 12 0 5 13 3 0 14 0 5 15 0 5 16 0 5 17 2 0 18 0 5 19 1 5 20 0 5 21 0 5 22 0 5 23 1 5 25 1 5 25 0 5 Table 5 Voltage quality in th...

Страница 37: ...BA_OLW A I OTE3_SW5x_DE_20160510_V2 37 48 15 Declaration of Conformity...

Страница 38: ...BA_OLW I OTE3_SW5x_EN_20160815_V2 38 48...

Страница 39: ...BA_OLW A I OTE3_SW5x_DE_20160510_V2 39 48 16 ERP Data...

Страница 40: ...BA_OLW I OTE3_SW5x_EN_20160815_V2 40 48...

Страница 41: ...umps CO d 1 5 T 15 C if TO 20 C T 15 C if TO 20 C Bivalent temperature Tbiv 5 C or air to water heat pumps TO 10 C Operation limit temperature ower input compressor off 0 Heating water operating limit...

Страница 42: ...n as otherwise any war ranty claims and or claims for damages and or claims for avoidance on account of an error shall be excluded Deviations of the ordered products from the deliv ered products such...

Страница 43: ...ernal control interference with the control soiling during construction phase insuffi cient water quality lack of hydraulic separation non specified valves viii if dimensioning is incorrect or if the...

Страница 44: ...Fig 32 Switch on heat generator pump 2 The measured flow rate is displayed this must correspond to the nominal flow Fig 33 Reading flow rate Setting p c Set the flow rate by turning the red adjustmen...

Страница 45: ...RS 25 7 5 922523 2 12 35 33 110 1 12 OLWA 18 Yonos Para RS 25 7 5 922523 2 64 44 00 200 2 04 OLWI 9 Stratos Para 25 1 8 internal 1 55 25 83 70 0 71 OLWI 13 Stratos Para 25 1 8 internal 2 12 35 33 110...

Страница 46: ...Power supply to the heat pump 13 Fig 17 OLWI distribution box 14 Fig 18 Heating buffer 14 Fig 19 Seal the appliance inside 1 16 Fig 20 Seal the appliance inside 2 16 Fig 21 Seal the appliance inside 3...

Страница 47: ...BA_OLW I OTE3_SW5x_EN_20160815_V2 47 48...

Страница 48: ...inz kontakt ochsner at www ochsner com Zentrale Werk Ochsner Stra e 1 A 3350 Haag Tel 43 0 5 042458 Fax 43 0 5 04245 349 kontakt ochsner at www ochsner com Partner Hotline 0820 201020 Ochsner W rmepum...

Отзывы: