15
INSTALLATION INSTRUCTIONS
RECEIVING—INSPECTION
Upon receiving your PAC unit, inspect the packaging for any damage. All units are
shipped on a skid, and packaged in a triple-wall carton for added protection.
BEFORE INSTALLING
Check the unit for any damage. All OceanAire products are thoroughly inspected at the
factory and carefully packaged. If any damage is evident, contact OceanAire
IMMEDIATELY.
ELECTRICAL REQUIREMENTS
Check the nameplate located on the back of the unit to confirm the proper power is
available for the unit.
Refer to "Specifications"
section for voltage and amperage
requirements. For proper NEMA receptacles, refer to "Electrical service plug
configuration". When using extension cords, use the proper gauge cord, and check
cord voltage to the unit.
TIME DELAY FUSES/CIRCUIT BREAKERS ARE RECOMMENDED
WARNING
—OPERATING THE UNIT ON IMPROPER
VOLTAGE WILL VOID THE WARRANTY
ACCESSORIES
Verify that all accessories are correct for the model, and are installed in accordance
with all instructions.
START-UP
Install the unit in accordance with all local and state building codes, and install all
accessories. Allow for a clearance around the unit for future maintenance and/or
service. Level unit and lock casters, when available. Connect power and test the
LCDI on the power cord (if available). Power up unit, via thermostat and check for
proper operation. Refer to Thermostat Operation for more details.
Содержание AIR BOSS PAC60
Страница 4: ...2 SPECIFICATIONS PAC...
Страница 23: ...21 PIPING SCHEMATIC...
Страница 25: ...23 WIRING SCHEMATIC FOR PAC6012...
Страница 29: ...O A CEAN IRE www oceanaire inc com Plug L15 30P 27 WIRING SCHEMATIC FOR PAC6032...
Страница 30: ...28 O A CEAN IRE www oceanaire inc com Plug L16 20P WIRING SCHEMATIC FOR PAC6034...