10
Cut the mains cable to a length of 5 cm
and strip the insulation from the ends.
5 cm
230 V AC
mains cable
Sento LED faro up
Installation
Place the mounting plate over the
power outlet and against the ceiling,
and turn it until the elongated holes are
aligned as required. Mark the positions
where the holes are to be drilled.
Check the routing of the power
cables.
Drill two 6 mm diameter holes, push in
the rawlplugs so that they lie flush and
screw on the mounting plate (screws
and rawlplugs are included in the scope
of delivery).
Ensure that the screws finish flush with
the mounting plate.
Connected separately
Connected with through-wiring
Содержание Sento faro Series
Страница 1: ...Sento body faro Montageanleitung Mounting instructions up track...
Страница 2: ......
Страница 3: ...De up flat track...
Страница 4: ...2...
Страница 8: ...6 S f S f S f...
Страница 10: ...8 C O M b M 2 N...
Страница 17: ...15 m n...
Страница 18: ...16 H M O C b M...
Страница 24: ...22 E 1 S 3 2 1 0 Installation...
Страница 31: ...29 Anhang...
Страница 34: ...32...
Страница 35: ...En up flat track...
Страница 36: ...2...
Страница 40: ...6 S f S f S f...
Страница 42: ...8 C O M B m 2 m...
Страница 49: ...15 ng...
Страница 50: ...16 H c M O C B m...
Страница 56: ...22 E 1 b 3 2 1 0 Installation...
Страница 57: ...23 1 or 3 phase track adapter Housing with cover EUTRAC compatible 1 or 3 phase bus bar 230 V Sento faro track...
Страница 63: ...29 Appendix ng w n ng...
Страница 66: ...32...
Страница 67: ......