Version 5.1_2021 (31 March 2021)
21
8.4.
Final placement
When deciding on the location for the Compact Cool, sufficient
space around the air handling unit should be taken into
account to allow for operation and the work to be carried out.
At least 1 metre should be available at the front. The unit must
be able to suck in and extract air freely.
Ensure good and safe accessibility, and where necessary,
provide railings and/or fall protection, e.g. when positioning
the unit close to the roof edge.
The Compact Cool should be set up level and placed flush
with the ground frame on a stable surface so that the
inspection panels / doors can be opened and closed easily.
8.5.
Installation
Electrics connection, see photo.
Main switch 40A
5-pin plug 32A