background image

Installation and operation guide: 
Dual color obstaflash  OFI360-RW-048-U & OFI360-RW-240-U 
16/10/2018

 

OBSTA

 

2 rue Troyon 92316 Sèvres Cedex FRANCE 

Phone : +33 1 41 23 50 10      Fax : +33 1 41 23 50 11 

www.obsta.com

 

Page 
1/15

 

 

 

Edition October 2020

 

 

  
 
 

OFC-RR-240Vac 

 

 
 

 

 

 
 
 
 

INSTALLATION AND OPERATION GUIDE

 

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 

Содержание 113790-RR-240

Страница 1: ...olor obstaflash OFI360 RW 048 U OFI360 RW 240 U 16 10 2018 OBSTA 2 rue Troyon 92316 S vres Cedex FRANCE Phone 33 1 41 23 50 10 Fax 33 1 41 23 50 11 www obsta com Page 1 15 Edition October 2020 OFC RR...

Страница 2: ...List of models Designation Type and Color Input voltage P N OFC RR 240 Red color medium intensity type B 120 240Vac 113790 RR 240 OFC CTR 6E 3F 6A 240 Red color medium intensity type B 120 230Vac 113...

Страница 3: ...ion manual specifications or other literature II the items have not been misused or abused in any manner or repairs attempted thereon III written notice of the failure within the warranty period is fo...

Страница 4: ...ach system consists of one flash head and can be associated with power supply with ambient light sensor photocell and the interconnecting cable System components are shown in Figures 1 1 to 1 2 1 2 1...

Страница 5: ...ration guide Dual color obstaflash OFI360 RW 048 U OFI360 RW 240 U 16 10 2018 OBSTA 2 rue Troyon 92316 S vres Cedex FRANCE Phone 33 1 41 23 50 10 Fax 33 1 41 23 50 11 www obsta com Page 5 15 Figure 1...

Страница 6: ...ation guide Dual color obstaflash OFI360 RW 048 U OFI360 RW 240 U 16 10 2018 OBSTA 2 rue Troyon 92316 S vres Cedex FRANCE Phone 33 1 41 23 50 10 Fax 33 1 41 23 50 11 www obsta com Page 6 15 Figure 1 2...

Страница 7: ...h rate Type B Synchronization Master slave mode one master light can synchronized with other slave lights 1 3 2 Electrical input for 230Vac power supply 113176 240 Input voltage 100 240 V 10 Max curre...

Страница 8: ...LASH is usually mounted at the highest point on the structure on a horizontal platform or as per requirements of the local Aviation Regulation authority in place at the installation location We recomm...

Страница 9: ...RW 240 U 16 10 2018 OBSTA 2 rue Troyon 92316 S vres Cedex FRANCE Phone 33 1 41 23 50 10 Fax 33 1 41 23 50 11 www obsta com Page 9 15 2 3 Final check Before power on CHECK The input voltage The wiring...

Страница 10: ...10 20 This drawing it covers are the property of OBSTA This document connot reproducted copied or cummunicated with third parties without the authorization of OBSTA Ce document est la propri t d OBS...

Страница 11: ...the light output of the light Each flash head do have 2 independent led circuits 3 1 3 Latches The sealing of the light is ensure but the 2 latches and the O ring between flash head and the light bod...

Страница 12: ...obsta com Page 12 15 3 1 6 Shunt braid The flash head is attached to the light body through a shunt braid Assure the grounding of the light prevent loosing the flash head during installation PCBa LED...

Страница 13: ...night used without photocell Operation The green led GPS blinks the GPS receive the signal The red led D and the green led S blinks The GPS is not synchronized and sends a top sync to the command card...

Страница 14: ...e short circuit insulating failure destruction Corrosion Annual Visual Water inside flash head Annual Clean the glass of flash head Bad light output 4 2 Troubleshoot Malfunction 4 2 1Led indicators So...

Страница 15: ...chronization Red LED D4 sequence 1 long flash 1 short flash flash head at 15 flash per minute Check the connection of synchronization wires on the command cards both master and slave units GPS Red LED...

Отзывы: