Manual | RIM-FVU Field Verification Unit (FVU)
Status: Final | Not confidential
Page 2 | 13
V20200309
Document history
The Observator range is in continuous development and so specifications may be subject to change
without prior notice. When in doubt about the accuracy of this document, contact the Observator Group.
Reference documents
Type of document / tool
Product type and name (incl. url)
Manual
Revision history
Date
Amendments
Company, position
2017-07-31
Initial document creation
Observator Australia,
Document Controller
2017-10-24
Updated warranty conditions
Observator Australia,
Document Controller
2018-04-09
Introduced document control
Observator Australia,
Document Controller
2019-08-09
Quality review
Observator Australia,
Operation Manager
2019-08-27
Update product name
Observator Australia,
Document Controller
2019-08-30
Compress document images
Observator Australia,
Document Controller
2020-01-30
Updated document format
Observator Australia,
Document Controller
2020-03-09
Updated maintenance section
Observator Australia,
Document Controller
Procedure sign-off:
Date
Company, position
Status
2019-07-15
Observator Australia, Document Controller
Finished
2019-12-06
Observator Australia, Managing Director
Approved
2020-02-10
Observator Group, Communication Officer
Approved
Distribution list
Date
Company, position