Mounting instructions, concrete plinth
Threaded rod
isFang 3B-G1 (5408971) for 1 FangFix
stone
isFang 3B-G2 (5408972) for 2 FangFix
stones
isFang 3B-G3 (5408973) for 3 FangFix
stones
FangFix stone
F-FIX-S16 (5403227)
Edge protection
Remove the plastic bar in the middle of the
edge protection using a side cutter or
Ø
20
mm drill and then push the threaded rod
through the opening from beneath.
1. Make available
2. Preparation
From above, position the concrete plinth on
the threaded rod and fix it with a lock nut.
3. Assembly
Mounting instructions, interception rod stand
Use gloves to avoid injury.
Make the prefabricated concrete plinth and
interception rod stand (type isFang 3B-...).
Remove the lock nuts on the threaded rods,
then open the interception rod stand and
mount it on the concrete plinth.
To use the isFang 3b-150 (1.5 m spreading
width) interception rod system in areas with
higher wind speeds, two concrete plinths
must be positioned next to each other at the
foot of the interception rod.
Using a spirit level, compensate the tripod
stand according to the roof slope (maximum
5
°
) and then tighten the lock nuts.
Insert the interception rod into the retaining
unit of the interception rod stand from above
and fix it with a tension clip.
Incl. Rd 8
−
10 crossbar to fasten the round
cable to the interception rod.
OBO Bettermann GmbH & Co. KG
Postfach 1120
D-58694 Menden
www.obo.de
Kundenservice Deutschland
Tel.: 0 23 73/89-15 00
Fax: 0 23 73/89-77 77
E-Mail: [email protected]
1. Make available
2. Positioning
3. Higher wind-speed zones
4. Compensation for roof slant
5. Fixing
6. Connection