background image

Mounting instructions, concrete plinth

Threaded rod

isFang 3B-G1 (5408971) for 1 FangFix

stone

isFang 3B-G2 (5408972) for 2 FangFix

stones

isFang 3B-G3 (5408973) for 3 FangFix

stones

FangFix stone

F-FIX-S16 (5403227)

Edge protection

Remove the plastic bar in the middle of the

edge protection using a side cutter or 

Ø

 20

mm drill and then push the threaded rod

through the opening from beneath.

1. Make available

2. Preparation

From above, position the concrete plinth on

the threaded rod and fix it with a lock nut.

3. Assembly

Mounting instructions, interception rod stand

Use gloves to avoid injury.

Make the prefabricated concrete plinth and

interception rod stand (type isFang 3B-...).

Remove the lock nuts on the threaded rods,

then open the interception rod stand and

mount it on the concrete plinth.

To use the isFang 3b-150 (1.5 m spreading

width) interception rod system in areas with

higher wind speeds, two concrete plinths

must be positioned next to each other at the

foot of the interception rod.

Using a spirit level, compensate the tripod

stand according to the roof slope (maximum

5

°

) and then tighten the lock nuts.

Insert the interception rod into the retaining

unit of the interception rod stand from above

and fix it with a tension clip.

Incl. Rd 8

10 crossbar to fasten the round

cable to the interception rod.

OBO Bettermann GmbH & Co. KG

Postfach 1120

D-58694 Menden

www.obo.de

Kundenservice Deutschland

Tel.: 0 23 73/89-15 00

Fax: 0 23 73/89-77 77

E-Mail: [email protected]

1. Make available

2. Positioning

3. Higher wind-speed zones

4. Compensation for roof slant

5. Fixing

6. Connection

Отзывы: