![OBO Bettermann EÜK VK Series Скачать руководство пользователя страница 27](http://html1.mh-extra.com/html/obo-bettermann/euk-vk-series/euk-vk-series_mounting-instructions_3177584027.webp)
EN | 27
EÜK mounting instructions
Applying the screed
corrugated card).
Risk of damage through incorrect screed laying!
Incorrect mounting of the insulating edge strip can lead to an unstable
position and product damage!
Apply the insulating edge strip directly around the underfloor junction
boxes/underfloor device sockets.
Note!
Should a separating layer be required when used in floating screed/
heated screeds on insulation layers, the box can be separated from the
screed by an insulating strip (3–5 mm). For this, the separating layer
must also be applied under the top socket frame.
Note!
The entire duct system must be mounted before the screed work. Other-
wise, the unit cannot be created properly.
Fig. 20:
Applying the insulating edge strip
ATTENTION