background image

 

 

Ratchet with torque and socket wrench insert 17 mm 

 

Measuring tape min. 50 m 

 

Cord 50 

 100 m 

1.3   

Tightening torques for screws

 

 

Hexagon head screw DIN933 M12x40 (ram profile (A) - rafter profile (B)) 

100 Nm

 

 

Hexagon head screw DIN EN 14399/4 M12x40 (HV)   

 

 

130 Nm 

 

Hexagon head screw DIN933 M12x40 (rafter profile (B) - purlins (C))   

60 Nm

 

 

Screws for module clamps 

 

 

 

 

 

 

8 - 10 Nm

 

After assembly, a random check of the tightening torque, min. 5 % of all screw connections, is 
recommended. The inspection should be repeated annually as part of the maintenance work. 

 

2.   

The Assembly 

A proven method is the foundation by means of ram profiles consisting of galvanized steel. The static 
requirements at the site and the results of the soil investigation are decisive for the length of the 
piles. 

These are rammed into the ground by pile-driving machines, whereby optimum alignment in all 
directions is possible. 

Step 1: Measuring of the ram points and material distribution 

Red marks: 

 

These marks are measured in advance by the surveyor and permanently marked. The surveyor is 
commissioned by the client and should start surveying at the earliest one week before the start of 
construction and have completed the work by the day of the start of construction at the latest. 

Black marks: 

These marks are measured by the installation team. This is usually done by laying out a long 
measuring tape (50 - 100 m) and then marking the ram points (black marks) on the measuring tape. 
The distances depend on the pile-driving plan and the measuring charts which you receive from 
Oberhauser. 

The material (piles) is then distributed in the field to make assembly times more efficient. 

 

 

 

Содержание ISYS 1.1

Страница 1: ...Installation Manual Art Nr FRTSTV Open Land System ISYS 1 1...

Страница 2: ...itate to contact us at any time Content 1 General Information 3 1 1 Designation of the individual parts 3 1 2 Overview of required tools and auxiliary materials 3 1 3 Tightening torques for screws 4 2...

Страница 3: ...ystems our specially developed mounting systems have significant time saving features that enable more efficient work when mounting the substructure and modules If you do not want to deal with the ins...

Страница 4: ...photovoltaic modules may only be installed in accordance with the manufacturer s instructions 1 1 Designation of the individual parts A Ram profile C140 x 80 mm Length according to requirements B Raft...

Страница 5: ...on are decisive for the length of the piles These are rammed into the ground by pile driving machines whereby optimum alignment in all directions is possible Step 1 Measuring of the ram points and mat...

Страница 6: ...5 1 2 Step 2 Ramming works A...

Страница 7: ...6 2 1 Step 3 Installation of rafter profiles A B E F B A G Torque 100 Nm A2 A4 130 Nm HV...

Страница 8: ...7 1 2 Step 4 Installation of diagonal braces E F J B A E F G J B A G Torque 100 Nm A2 A4 130 Nm HV...

Страница 9: ...8 1 2 3 Step 5 Installation of purlins G B E F C G B C Torque 60 Nm...

Страница 10: ...9 1 2 Step 6 Installation of purlin connectors The number of connectors to be used depends on the table design Torque 60 Nm E F B C D G...

Страница 11: ...10 Click in Click in 1 2 3 4 Step 7 Installation of modules C I Torque 8 10 Nm...

Страница 12: ...11...

Страница 13: ...12 Click in Click in Press Press 5 6 7 H...

Страница 14: ...13 8 9 Torque 8 10 Nm Continue until the last module in the row is fixed At the end of the row a module end clamp is used again...

Страница 15: ...hief In order to prevent this from happening we will be pleased to supply you with our safety balls or optionally shear nuts and or safety screws on request Depending on the measures selected theft is...

Страница 16: ...client by means of appropriate expert opinions when the contract is awarded The company Oberhauser Bau Systeme GmbH certifies surface lifetime of 25 years within the scope of and in accordance with al...

Страница 17: ...iod from the day of building approval but at the latest from the day of final invoicing 11 These conditions are a complete part of the contract concluded between Oberhauser Bau Systeme GmbH and the cu...

Страница 18: ...the current state of the art Oberhauser is not liable for improper handling of the installed components With proper handling dimensioning according to the static conditions adherence to the maintenanc...

Страница 19: ...18 Oberhauser Bau Systeme GmbH Rohrbach Bahnhof 18 84494 Niederbergkirchen Tel 49 0 8635 69392 0 Fax 49 0 8635 69392 20 E Mail info oberhauser pv de...

Отзывы: