Oasis DM104 Скачать руководство пользователя страница 4

We reserve the right to modify product specifications without prior notice.

 

DM104

-

INS

-

01 2822 © Oasis Engineering Limited

 

5. Attach outlet connections (times 2).

 

Recommended torque = 50Nm

 

6. Attach actuator 

take off pipe

’.

 

Recommended torque = 18Nm

 

7.  Leak test connections with Snoop or soapy water.

 

IF NOT USING THE ACTUATOR 

PORT THIS MUST BE PLUGGED. 

 

Installation 

Instructions 

Содержание DM104

Страница 1: ...liable in such circumstances where installation operation and maintenance procedures were performed by incompetent personnel resulting in improper assembly unsafe operation equipment damage or persona...

Страница 2: ...icing work is carried out Warning High pressure gas and gas equipment can cause serious harm to both infrastructure and personnel if safety precautions are not followed Oasis recommends considering th...

Страница 3: ...enter inlet connection first Recommended torque 50Nm 4 Attach third inlet connection Recommended torque 50Nm 1 Mount the manifold 3 Attach second inlet connection Recommended torque 50Nm We reserve th...

Страница 4: ...INS 01 2822 Oasis Engineering Limited 5 Attach outlet connections times 2 Recommended torque 50Nm 6 Attach actuator take off pipe Recommended torque 18Nm 7 Leak test connections with Snoop or soapy w...

Страница 5: ...nting Inlet ports It is recommended that the low pressure line is connected closest to the actuator take off port Actuator take off port Outlet port to the fill line Outlet port to the fill line We re...

Страница 6: ...leaner Warm Soapy Water or Similar Pick Tool TOOL PICK Sold separately Spanner Wrenches Anti Seize Grease Loctite 771 or Similar For All Threads Sockets Torque Wrench The Complete Oasis Seal Kit must...

Страница 7: ...n 2 Remove the 2 outlet connections 1 Remove actuator and take off pipe if used 5 Remove the middle inlet connection last 6 Remove from mounting 7 Loosen all 24 manifold bolts WARNING ENSURE ALL PRESS...

Страница 8: ...t prior notice DM104 INS 01 2822 Oasis Engineering Limited 8 Remove the four bolts for end valve 9 Remove the sandwich valve Repeat this on the other side 10 Remove the center valve and manifold block...

Страница 9: ...ve the actuator from the sandwich valve 17 Service the sandwich valve Discard the surface O rings Service the sandwich valve as per the 100 Series Sandwich Valves Servicing Instructions 18 Clean compo...

Страница 10: ...old block 2 Attach the actuator to the sandwich valve 1 Apply silicone grease to surface O rings then attach Insert drive dog into valve 025 Nitrile 90 8 Attach second manifold block center valve 6 Ap...

Страница 11: ...bolts and screw in loosely Repeat for the remaining valves 10 Torque all bolts to 26Nm 11 Re install as instructed on page 3 Test for leaks using snoop or soapy water on first use Recommended Torque...

Отзывы: