Oasis SmartChem - INSTALLATION AND OPERATION MANUAL
Page
13
of
22
4.
ANCILLARY INSTRUCTIONS
Maintenance Schedule
Fortnightly
• Check the level of the Acid bottle /tub to ensure that it won’t run dry. Use a 2:1 water acid mix
ratio.
WARNING: Always add concentrated acid to water when diluting, NOT water to Acid.
• Test pool Water Chemistry.
3 Monthly
• Ensure that the Check valve is holding liquid in the feed tube.
• Check and ensure that the acid feeding tube is clean and clear where it injects acid into the
piping. Clean or trim the tubing if required.
6 Monthly
• Get your pool Water Chemistry tested at a pool store. Adjust calibration of the sensor readings
if required. Use the pH and ORP Offsets to adjust (see page 8 of this manual).
• Check all tubes, fittings and connections to ensure no leaks.
• Check the squeeze tube in the Peristaltic pump to ensure that it isn’t leaking, replace if doing
so. Apply a silicon lubricant to the tube and gears if necessary
• Clean and re-calibrate the probes if necessary. Cleaning instructions are on Pg 16 of this
manual.
Yearly
• Check the squeeze tube in the Peristaltic pump to ensure that it isn’t leaking, replace if doing
so. Apply a silicon lubricant to the tube and gears if necessary. Replacement Part No: 3223109.
o
It is recommended that the squeeze tube be replaced every 12 months for optimum
performance.
Regular checks and maintenance will ensure trouble free performance and longevity of the
Oasis SmartChem
system.
Get in contact with your local pool technician if you need help with the maintenance of your pool and or
your pool equipment and the
Oasis SmartChem
system.
Содержание SmartChem
Страница 1: ......
Страница 19: ...Oasis SmartChem INSTALLATION AND OPERATION MANUAL Page 18 of 22...
Страница 24: ...Oasis SmartChem INSTALLATION AND OPERATION MANUAL Page 23 of 22 9 NOTES...