background image

Cod. 035392  Rev.001 del 20/12/11

ROUTINE  

MAINTENANCE

(EVERY 6 MONTHS)

•  Maintenance must be carried out by 

qualified personnel only.

•  Visually check the general condition 

of the external components of the 

chain barrier

•  Check that the chain winds correctly 

on the drive pulley.

•  Make  sure  the  emergency 

manoeuvre is working properly.

•  Make sure the control unit and safety 

devices are in proper working order.

•  Check that the chain guide on the 

ground is clear of debris

• Do not allow persons or children 

to remain within the automation 

operation area.

• Keep  radio  control  or  other 

control  devices  out  of 

children’s  reach,  in  order  to 

avoid unintentional automation 

activation.

O&O

 s.r.l. - Via Europa, 2  - 42015 CORREGGIO (R.E.)  Italy  

 tel. +39 (0)522  740111  -  fax +39 (0)522  631290

http://www.oeo.it   -   email: [email protected]

Società soggetta ad attività di direzione e coordinamento di SOMFY S.A.

Company subject to management and coordination activities by SOMFY S.A.

Содержание PRIVEE

Страница 1: ...tion et d entretien Installations Gebrauchs und Wartungsanleitungen Instrucciones para la instalaci n el uso y el mantenimiento Barriera a catena Chain barrier Barri re cha ne Automatische Kettenschra...

Страница 2: ......

Страница 3: ...itable for heavy duty use SCHEDA TECNICA TECHNICAL DATA SHEET FICHE TECHNIQUE TECHNISCHE TABELLE FICHA T CNICA ALIMENTAZIONE POWER ALIMENTATION STROMVERSORGUNG ALIMENTACI N 230 Va c 10 50 60 Hz MOTORE...

Страница 4: ...phasenleitung 3 x 1 5 2 Empf ngerfotozelle 4 x 0 5 3 Senderfotozelle 2 x 0 5 4 Blinkleuchte 2 x 0 5 5 Schl sselschalter 2 x 0 5 6 Magnetdetektor Verdrilltes Kabel 1 Linea monof sica 3 x 1 5 2 Fotoc lu...

Страница 5: ...OFF INSTALLACI N PRIVEE OFF CH 17 CH 17 5 INSTALLAZIONE PRIVEE ON INSTALL PRIVEE ON INSTALLATION PRIVEE ON INSTALL PRIVEE ON INSTALLACI N PRIVEE ON Catena 8 Chain 8 Chaine 8 Kette 8 Cadena 8 Catena 5...

Страница 6: ...CH 17 ALLINEARE LE MAGLIE ALIGNING CHAIN LINKS ALIGNEMENT DES MAILLONS DIE KETTENGLIEDER AUSRICHTEN ALINEAR LOS ESLABONES CH 13 CH 17...

Страница 7: ...he LOG BC control unit s installation and operating manual Consulter le manuel d installation et d utilisation de la centrale LOG BC Die Installations und Bedienungsanleitungen der Steuereinheit LOG B...

Страница 8: ...ERGENZA HAND MANOEUVRE MANOEUVRE MANUELLE MANUELLE BET TIGUNG MANIOBRA MANUAL USE Consult the LOG BC control unit s installation and operating manual Followtheinstructionsgiveninpoint 9toreleaseinthec...

Страница 9: ...e for the buffer batteries Check that a differential switch with a 0 03A threshold is fitted just before the power supply mains Check that earthing is carried out correctly Installation must be carrie...

Страница 10: ...es are in proper working order Check that the chain guide on the ground is clear of debris Donotallowpersonsorchildren to remain within the automation operation area Keep radio control or other contro...

Отзывы: