1 / 18
CONTENTS
1.
ABOUT THIS MANUAL ………………………………………………………………………………………….…………..………… 2
2.
SAFETY INSTRUCTIONS AND WARNINGS ……………………………………………………………………..………………… 2
3.
OVERVIEW of GT120THU
……………………………………………………………….……………………………..……… 3
4.
SPECIFICATIONS of GT120THU
………………………………………………………………………………….…………………
3
(1) GT120THU engine
(2) OGA-200 generator
(3) ORF-200 regulate rectifier
5.
THE NAME OF EACH PART……………………………………………………………………………………..………………………
4-6
6.
BATTERIES
……………………………………………………………………………………………………………………………..……
6
(1) Battery of throttle & choke servo and starter switch
(2) Ignitor battery
(3) Starter battery
7.
REGULATE RECTIFIER
……………………………………………………………………………..……………………………………
6
8.
COOLING SYSTEM
………………………………………………………………………………………………………………..………
7
9.
INSTALLATION OF THE ENGINE AND OTHER EQUIPMENT…………………………………………………………………
7
(1)
Engine installation
(2)
Fitting the silencer
(3)
Air cleaner installation
10.
FUEL TANK
………………………………………………………………………………………….……………………….………………
7
11.
PIPING
………………………………………………………………………………………………….……………………………..………
8
12.
WIRINGS ……………………………………………………………………………………………………….………………………..………
8
(1) Wirings of throttle servo, choke servo and starter switch
(2) Wirings of starter switch
(3) Regulate rectifier output wirings
13.
MIXING OF OIL
………………………………………………………………………………………………………..……………………
8
14.
BREAKING IN ……………………………………………………………………………………………………………………………..……
9
15.
START-UP INSPECTION
……………………………………………………………………………………………………….…………
9
16.
PROCESS OF STARTING ENGINE
……………………………………………….…………………………………………………
9-10
(1) Getting gas in carb
(2) Choke
(3) Start the engine
(4) Dealing with engine start problems
17.
WARMING UP THE ENGINE
…………………………………………………………………………………….……….……………
11
18.
ADJUSTMENT OF CARBURATOR
…………………………………………………….……………….……………………………
11
(1) Adjustable range of high and low end needle
(2) Adjustment before taking off
(3) Adjustment during hovering
(4) Adjustment during flight
19.
INSPECTIONS BEFORE FLIGHT………………………………………………………………………………………….….……………
12
20.
FLIGHT
……………………………………………………………………………………………………………………..….….……………
12
21.
MAINTENANCE AFTER THE FIRST FLIGHT
………………………………………………………….………….….……………
13
22.
OPERATION LOG
………………………………………………………………………………………………………………..….………
13
23.
PERIODICAL INSPECTION AND MAINTENANCE …………………………………………………….……….….……………
13
(1) Inspection after 25-hour flight
(2) Inspection after 50-hour flight
(3) Inspection after 100-hour flight
24.
AFTER-SALES SERVICE
…………………………………………………………..………….……………………….………….………
13
25.
EXPLODED VIEW
………………………………………………………………………………….……………….….....……….………
14
26.
PARTS LIST
……………………………………………………………………………………………………………….…….……..………
15
27.
3-VIEW DRAWING ……………………………………………………………………………..………………………..…………..………
16
Содержание GT120THU
Страница 6: ...5 18 Fig 2 Fig 3...
Страница 15: ...14 18 25 EXPLODED VIEW FIG 8...
Страница 19: ...18 18 27 3 DEMENSIONAL DRAWING unit mm...