nVent.com
|
13
a. Sensor positioning
1. For optimal performance ambient sensor shall be placed on the north part of the
building.
2. Moisture sensor shall be positioned on south building side at the lowest level.
5. Commissioning and test procedures
For installation documentation use the commissioning report document
ML-RAYCHEMGMCW-CR-EU0515 available in the packaging.
1
2
Содержание Raychem GM-2CW
Страница 79: ...nVent com 79 ...