KANSAS PRO IP65 SELF TEST INSTRUCTIONS
Issue 12 21
st
December 2021
THANK YOU
for buying this product. To help ensure it gives complete satisfaction please install it according to these
instructions and then pass the instructions to the appropriate person for retention and future reference.
SAFETY
This is a mains voltage powered product. It is designed to be installed by suitably qualified personnel
only and in accordance with the applicable building and electrical regulations. Before installation or
maintenance, the electrical supply to the product must be isolated.
This luminaire must be
earthed.
INSTALLATION SUPPORT
If installation advice or accessories are required, please contact us at the above
address. When reporting a suspected fault or seeking installation support the problem is likely to be resolved more quickly if you
have full product details to-hand, as well as details of when and where it was purchased.
LUMINAIRE INSTALLATION
1. Unclip the front cover using a flat blade screwdriver, and carefully inserting it into & releasing the 6 clip points (2 each
side, one top & bottom).
2. Secure the luminaire in position using the drill out points provided on the back wall of the luminaire body.
3. Drill out the desired 20mm diameter cable entry point (located on each side wall of the luminaire body) & fit the cable
gland provided.
4. Route the power supply cable through the cable gland to the terminal block and terminate ensuring correct polarity is
observed.
5. Plug the Battery loom onto the PCB connector marked BATT.
6. Rotate & angle the lamp heads to the required direction. The bolts/screws on the lamp heads may need to be loosened
to do this – ensure they are re-tightened afterwards to hold position.
7. Refit the front cover to the luminaire body.
8. Connect the power supply & check that the green indicator LED illuminates. At this time the luminaire will undertake an
initial short functional self-test (please see below under ‘Self-Test Function’).
MAINTENANCE
1.
This unit is using Lithium Iron Phosphate cell (LiFePO4) in its battery pack. These batteries require close
monitoring and protection circuitry to operate safely. This pack uses a dedicated protection built into the
module unit. Ensure like for like batteries are used in any replacement maintenance.
2. This luminaire MUST be disconnected before the circuit it is installed on is subjected to any high voltage or insulation
resistance testing, otherwise irreparable damage will occur to luminaire components.
3. Ensure cleanliness of luminaires is maintained so as not to affect performance.
4. The battery in this luminaire must be replaced when it is no longer able to meet its rated duration.
5. The luminaire operating temperature range is 0⁰C - +40⁰C.
SELF TEST FUNCTION
This luminaire comes with a built-in self-test facility. Once given a permanent mains supply, the luminaire will automatically carry
out a monthly functional check & an annual full duration test, in line with the testing procedures of BS 5266 and BS EN 50172.
Initial Test
Upon receiving a permanent mains power supply, the luminaire will immediately carry out a short (30s) functional test.
Following this it will charge for 24 hours before carrying out a 3-hour duration test. DO NOT REMOVE THE MAINS POWER
SUPPLY DURING THIS PERIOD. During this test the lamp heads will illuminate & the LED status indicator will rapidly flash
red.
Monthly Function Test
The luminaire will carry out a 30 second function test, selected randomly between day 15 to day 30 after installation so that all
self-test products do not go into test mode at the same time. During this test the lamp heads will illuminate & the LED status
indicator will rapidly flash red. This test will be repeated every 30 days.