Figure 4-4 Nu-Link-Gang Connects to PC 

 

4.5.2  ICP Programming Tool Setting 

1. 

Choose  “Connect”.  The  window  will  shows  “NuLink  connected”  when  the  connection  between 
programming unit and ICP Programming Tool is built. 

2. 

Load the firmware image files to the corresponding flash region. 

3. 

Set the program option. It is necessary to select the “Offline Programming Mode” option. 

4. 

Click  “Start”.  The  ICP  Programming  Tool  will  start  loading  the  firmware  image  files  to  the  Nu-
Link-Gang. 

User needs to repeat section 4.5.1 and 4.5.2 to load firmware image file to every programming unit. 

Содержание NuMicro Nu-Link-Gang

Страница 1: ...of Nuvoton Technology Corporation and shall not be reproduced without permission from Nuvoton Nuvoton is providing this document only for reference purposes of NuMicro microcontroller based system de...

Страница 2: ...0519 M0564 M058S Mini51 Mini51X Mini57 Mini58 NM1120 NM1200 NM1230 NM1320 NM1330 NM1500 NM1810 NM1820 TF5100 Nano100 Nano103 NDA102 NUC029 NUC100 NUC121 NUC126 NUC131 NUC200 AU9110 I91000 N569 N570 N5...

Страница 3: ...oad Firmware Image Files through NuMicro ICP Programming Tool 13 3 3 1 Connect to ICP Programming Tool 13 3 3 2 ICP Programming Tool Setting 13 3 3 3 Import Export Project 14 3 4 Connect to the Target...

Страница 4: ...n 25 5 1 2 Waveform 26 6 NU LINK GANG PCB SCHEMATIC 27 6 1 Control Unit Schematic 27 6 2 Power and Connection Schematic 28 6 3 1 NuLink Schematic 29 6 4 2 NuLink Schematic 30 6 5 3 NuLink Schematic 31...

Страница 5: ...a automatic IC programming system Overall the Nu Link Gang offers more flexibility and high efficiency than what usual programmers offer for mass production The Nu Link Gang programmer is easy to use...

Страница 6: ...Button Bottom Upgrade interface All start Button Power LED A Adaptor Board Connector Single start Button Programming Voltage Switch Status LED Adaptor Board Aid Connector Top USB Connector A Programm...

Страница 7: ...PASS1 FAIL1 BUSY1 START1 PASS2 FAIL2 BUSY2 START2 PASS3 FAIL3 BUSY3 START3 PASS4 FAIL4 BUSY4 START4 Table 2 1 Programming Unit s Component List 2 1 2 Power Supply Use DC 9V 1A power adapter with DC t...

Страница 8: ...y and LCD Control Button The LCD display shows each unit s detail such as IC s part number programming times programming voltage error message and etc Uses LCD control buttons to switch pages Enter Bu...

Страница 9: ...ED Green PASS Red FAIL Table 2 4 Status LED on Nu Link Gang 2 1 7 Control Bus The Nu Link Gang can be connected to a automatic IC programming system through the control bus Figure 2 6 Control Bus 2 1...

Страница 10: ...rted IC Status LED 1 2 3 4 Figure 2 8 Nuvoton ICP Gang Adapter Programming Unit 1 2 3 4 Nuvoton ICP Gang Adapter 1 2 3 4 Status LED on Nuvoton ICP Gang Adapter LED1 LED2 LED3 LED4 LED5 LED6 LED7 LED8...

Страница 11: ...ton NUC505 ICP Gang Adapter Programming Unit 1 2 3 4 Nuvoton ICP Gang Adapter 1 2 3 4 Status LED on Nuvoton ICP Gang Adapter LED1 LED2 LED3 LED4 LED5 LED6 LED7 LED8 IC Mode Switch on Nuvoton NUC505 IC...

Страница 12: ...ANG USER MANUAL 2 3 2 Status LED The status LEDs on the Nu Link Gang and the Nuvoton ICP Gang Adapter show the programming results of every unit Light Status Figure 2 12 Status LED Green PASS Red FAIL...

Страница 13: ...s through NuMicro ICP Programming Tool Please access Nuvoton NuMicro website http www nuvoton com NuMicro to download the NuMicro ICP tool ICP Programming Tool Unzip the file and execute NuMicro ICP P...

Страница 14: ...start loading the firmware image files to the Nu Link Gang User needs to repeat section 3 3 1 and 3 3 2 to load firmware image file to every programming unit 1 Connect 2 Load File 3 Config Bits 4 Pro...

Страница 15: ...socket Pin 1 is on the bottom left hand side Figure 3 4 Nuvoton ICP Gang Adapter with Nu Link Gang 3 4 2 Customized Adapter Board Follow Figure 3 5 to connect the adapter board and the Nu Link Gang s...

Страница 16: ...ang Adapter will show the programming results of every unit Green light PASS Red light FAIL 3 Change the target chip in the adapter and repeat section 3 5 process 3 5 2 LCD Display Users can switch pa...

Страница 17: ...gramming area and config bits The checksum data and config bits are the same as the data in ICP Programming Tool Press Enter button to go to page 1 Programming Unit Enter Button Select Button Page PAS...

Страница 18: ...e to the computer and then config the ICP Programming Tool as 3 3 the part number of the target chips will shows on the LCD display as Figure 3 11 and Figure 3 12 Programming Unit Enter Button Select...

Страница 19: ...it by setting corresponding programming voltage switch Please sets the programming voltage before the Nu Link Gang power on 4 2 Set the Programming Mode Switch the programming mode to single start or...

Страница 20: ...4 2 Slot Pin Description 4 4 IC Mode Switch Switch four programming units IC mode to Mode 1 on the Nuvoton NUC505 ICP Gang Adapter as Figure 4 3 Figure 4 3 IC Mode in Mode 1 4 5 Load Firmware Image F...

Страница 21: ...tion between programming unit and ICP Programming Tool is built 2 Load the firmware image files to the corresponding flash region 3 Set the program option It is necessary to select the Offline Program...

Страница 22: ...ing 4 5 3 Import Export Project The user settings of the ICP Programming Tool can be save and load by import or export the icp project file It can also do the binary code protection through exporting...

Страница 23: ...or the individual Start button depends on the programming mode switch setting to start the programming process The status LEDs on the Nu Link Gang and the Nuvoton NUC505 ICP Gang Adapter will show the...

Страница 24: ...Nu Link Gang Dec 23 2019 Page 24 of 37 Rev 1 00 NU LINK GANG USER MANUAL Figure 4 9 LCD Display...

Страница 25: ...the programming voltage and firmware image file for four programming units individually Switch the programming mode to single start 5 1 1 Connection Each programming units connects to the automatic IC...

Страница 26: ...START 3 Programming start up BUSYx is set to logic 0 and might toggle during programming 4 When finish programming BUSYx is set to logic 1 and PASSx or FAILx is set to logic 0 When BUSYx is set to log...

Страница 27: ...A 13 PWM0_CH1 UART5_TXD 39 PA 12 PWM0_CH0 UART5_RXD 40 PF 7 ICE_DAT 41 PF 6 ICE_CLK 42 AVSS 43 PA 0 ADC0 I2C1_SCL UART5_TXD PWM0_CH4 44 PA 1 ADC1 I2C1_SDA UART5_RXD PWM0_CH5 45 PA 2 ADC2 UART3_TXD PWM...

Страница 28: ...DC5V 2 0mm 1 3 2 D C 5V I nput C10 10uF 10V 1 2 L16 FERRITE BEAD KEY1 V1 MC7805CT TO 220 IN 1 OUT 3 GND 2 GND 4 Power_GND KEY2 Trigger M_Trigger1 M_Trigger3 M_Trigger2 M_Trigger1 M_Trigger4 M_Trigger3...

Страница 29: ...DO_DIR1 VCOM_En SPI0_DI SPI0_CLK SPI0_CS SPI0_DO VBUS USBVBUS1 USB_D USB_D C42 10uF 10V 1 2 VCC_1 1 2 BUSY1 GREEN SMD M_Trigger1 M_Trigger1 KEY1 KEY1 U5 W25Q32 SOIC 8P CS 1 DO 2 WP 3 GND 4 DI 5 CLK 6...

Страница 30: ...SDA PA10 7 I2C0SCL PA9 8 RX1 PB4 10 TX1 PB5 11 RTS1 PB6 12 CTS1 PB7 13 PC3 SDO00 25 AVSS 43 ICE_CK 42 ICE_DAT 41 PA12 PWM0 40 LDO 14 VSS 16 VDD 15 ADC PA5 49 ADC6 PA6 50 ADC7 PA7 51 AVDD 52 CPN0 PC7 5...

Страница 31: ...O1 PB13 2 CPO0 PB12 3 VBUS 17 VDD33 18 D 19 D 20 PB0 RX0 21 PB1 TX0 22 PB2 RTS0 23 PB3 CTS0 24 PC2 SDI00 26 PC1 SPCLK0 27 PC0 SS00 28 PC11 SDO10 33 PC10 SDI10 34 PC9 SPCLK1 35 PC8 SS10 36 PA15 PWM3 37...

Страница 32: ...SPCLK0 27 PC0 SS00 28 PC11 SDO10 33 PC10 SDI10 34 PC9 SPCLK1 35 PC8 SS10 36 PA15 PWM3 37 PA14 PWM2 38 PA13 PWM1 39 X32I 4 X32O 5 I2C1SCL PA11 6 I2C0SDA PA8 9 I2C1SDA PA10 7 I2C0SCL PA9 8 RX1 PB4 10 TX...

Страница 33: ...R ev D at e Sheet of Doc V1 2 TFT LCD SPI A4 7 7 Monday December 05 2016 320 240 TFT LCD S8050 1 Base 3 Collector Si2301BDS 2 Source 3 Drain 1 Gate 2 Emitter LCM_LED J10 HEADER 10 2 0 1 2 3 4 5 6 7 8...

Страница 34: ...pdate the Nu Link Gang firmware please update the programming units firmware to the lastest version as well 7 3 Programming Unit Firmware Update It is recommended to update the ICP Programming Tool to...

Страница 35: ...Nu Link Gang Dec 23 2019 Page 35 of 37 Rev 1 00 NU LINK GANG USER MANUAL Figure 7 2 Pop up Warning Message Figure 7 3 Programming Unit Firmware Update...

Страница 36: ...Nu Link Gang Dec 23 2019 Page 36 of 37 Rev 1 00 NU LINK GANG USER MANUAL 8 REVISION HISTORY Date Revision Description 2019 12 23 1 00 1 Preliminary version...

Страница 37: ...is not limited to equipment for surgical implementation atomic energy control instruments airplane or spaceship instruments the control or operation of dynamic brake or safety systems designed for veh...

Отзывы: