
Nu-Link2-Pro Debugger and Programmer
Mar. 13, 2020
Page
41
of 77
Rev 1.00
NU
-LINK
2
-P
RO
D
E
B
UG
G
E
R
a
nd
P
RO
G
RA
MM
E
R U
S
E
R
M
A
NUA
L
Ma
k
er Nu
-m
be
d
NUC
47
2
Us
er Man
ua
l
(4) And then click the Connect button. Go to (5) if more than one Nu-Link2-Pro are connected with the
host. Go to (6) if only one Nu-Link2-Pro is connected with the host.
(5) If two Nu-Link Debugger and Programmers have been connected with the computer, a message
appears and asks to select one from the two adapters. Clicking
OK
will connect the selected adapter
with the host, as shown in Figure 5.2-3. When a Nu-Link2-Pro is selected for connection, the Status
LED starts blinking.
Figure 5.2-3 Select One Nu-Link2-Pro
(6) Click
Option
in the
Programming
section of the ICP Tool Window to open the
Program Option
form, as shown
in
(7) In the
Nu-Link Pro IO Voltage
section, specify the power voltage of the SWD port for the target
chip, and then click
OK
. To use the offline programming function, the Offline Programming mode
option needs to be selected, as shown in Figure 5.2-4.
Figure 5.2-4 ICP Tool Programming Options
(8) After the
Connect
button is clicked, the ICP Tool will be connected with the Nu-Link2-Pro, and a